Document Downloads: Local Development Framework
The following documents are available for download.
Documents in PDF format can be read using Adobe Reader. Where documents are available in other formats we will endeavour to provide a PDF version as well.
Available downloads
ACD03 Draft Flood and Water Management Bill
ACD03 Draft Flood and Water Management Bill
(PDF)
- Size: 1.12 MB
- Estimated download time: (56k = 2 mins 48 secs)
ACD04 Suffolk Haven Gateway ELR complete oct 09
ACD04 Suffolk Haven Gateway ELR complete oct 09
(PDF)
- Size: 11.17 MB
- Estimated download time: (56k = 27 mins 54 secs)
ACD05 East of England Implementation Plan
ACD05 East of England Implementation Plan
(PDF)
- Size: 3.59 MB
- Estimated download time: (56k = 8 mins 59 secs)
ACD06 East of England Plan Review to 2031
ACD06 East of England Plan Review to 2031
(PDF)
- Size: 1.97 MB
- Estimated download time: (56k = 4 mins 56 secs)
ACD07 Haven Water Cycle Study Stage 2 (Suffolk Districts)
Haven Gateway Water Cycle Study Stage 2 Main Document
(PDF)
- Size: 10.57 MB
- Estimated download time: (56k = 26 mins 23 secs)
HG Water Cycle Study Stage 2 - appendix A
(PDF)
- Size: 6.75 MB
- Estimated download time: (56k = 16 mins 53 secs)
HG Water Cycle Study Stage 2 - appendix B
(PDF)
- Size: 3.46 MB
- Estimated download time: (56k = 8 mins 39 secs)
HG Water Cycle Study Stage 2 - map 1
(PDF)
- Size: 4.68 MB
- Estimated download time: (56k = 11 mins 41 secs)
HG Water Cycle Study Stage 2 - map 2
(PDF)
- Size: 4.68 MB
- Estimated download time: (56k = 11 mins 41 secs)
HG Water Cycle Study Stage 2 - map 3
(PDF)
- Size: 4.45 MB
- Estimated download time: (56k = 11 mins 8 secs)
HG Water Cycle Study Stage 2 - map 4
(PDF)
- Size: 5 MB
- Estimated download time: (56k = 12 mins 29 secs)
HG Water Cycle Study Stage 2 - map 5
(PDF)
- Size: 6.24 MB
- Estimated download time: (56k = 15 mins 35 secs)
ACD08 AMR 2008-2009
ACD08 AMR 2008-2009
(PDF)
- Size: 761.12 KB
- Estimated download time: (56k = 1 mins 53 secs)
ACD09 PPS4 Ipswich Scoping Note 2010
ACD09 PPS4 Ipswich Scoping Note 2010
(PDF)
- Size: 114.74 KB
- Estimated download time: (56k = 17 secs)
ACD10 Ipswich Transport Model Assessment
ACD10 Ipswich Transport Model Assessment
(PDF)
- Size: 9.09 MB
- Estimated download time: (56k = 22 mins 42 secs)
ACD15 Ipswich Strategic Housing Market Assessment (SHMA)
This update was carried out in 2010.
Ipswich Strategic Housing Market Assessment (SHMA)
(PDF)
- Size: 2.14 MB
- Estimated download time: (56k = 5 mins 21 secs)
Adopted Core Strategy Proposals Map
Map showing the Adopted Core Strategy Proposals
Adopted Core Strategy Proposals Map
(PDF)
- Size: 2.71 MB
- Estimated download time: (56k = 6 mins 47 secs)
Adoption of the Core Strategy and Policies Development Plan Document
The Ipswich Borough Council Core Strategy and Policies Development Plan Document (DPD) and Proposals Map were formally adopted by the Council on 14 December 2011.
Core Strategy Adoption Statement December 2011
(PDF)
- Size: 15.44 KB
- Estimated download time: (56k = 3 secs)
Sustainability Appraisal and Strategic Environmental Assessment Adoption Statement
(PDF)
- Size: 29.41 KB
- Estimated download time: (56k = 5 secs)
Sustainability Appraisal report
(PDF)
- Size: 2.6 MB
- Estimated download time: (56k = 6 mins 30 secs)
Adopted Proposals Map
(PDF)
- Size: 2.17 MB
- Estimated download time: (56k = 5 mins 26 secs)
Adopted Core Strategy and Policies Development Plan Document
(PDF)
- Size: 2.4 MB
- Estimated download time: (56k = 6 mins 0 secs)
Appropriate Assessment Update letter
Core Document ref: ECD14
Appropriate Assessment Update letter
(PDF)
- Size: 664.55 KB
- Estimated download time: (56k = 1 mins 38 secs)
Appropriate Assessment Update letter
Core Document Library ref: ECD15
Appropriate Assessment Update letter
(PDF)
- Size: 719.11 KB
- Estimated download time: (56k = 1 mins 47 secs)
Authority Monitoring Reports (AMR)
The purpose of the Authority Monitoring Report (AMR) is to review progress on local development document preparation and to monitor the outputs and implementation of current policies.
Annual Monitoring Report 2004/2005
(PDF)
- Size: 208.34 KB
- Estimated download time: (56k = 31 secs)
Annual Monitoring Report 2005/2006
(PDF)
- Size: 344.33 KB
- Estimated download time: (56k = 51 secs)
Annual Monitoring Report 2006/2007
(PDF)
- Size: 330.15 KB
- Estimated download time: (56k = 49 secs)
Annual Monitoring Report 2007/2008
(PDF)
- Size: 344.6 KB
- Estimated download time: (56k = 51 secs)
Annual Monitoring Report 2008/2009
(PDF)
- Size: 761.12 KB
- Estimated download time: (56k = 1 mins 53 secs)
Annual Monitoring Report 2009/2010
(PDF)
- Size: 924.55 KB
- Estimated download time: (56k = 2 mins 17 secs)
Annual Monitoring Report 2010/2011
(PDF)
- Size: 658.05 KB
- Estimated download time: (56k = 1 mins 38 secs)
Authority Monitoring Report 2011/2012
(PDF)
- Size: 708.15 KB
- Estimated download time: (56k = 1 mins 44 secs)
Central Government Circular 9/95: General Development Order Consolidation 1995
Central Government Circular 9/95: General Development Order Consolidation 1995
(PDF)
- Size: 14.92 MB
- Estimated download time: (56k = 37 mins 17 secs)
Colchester Borough Council Core Strategy Policy ER1
Colchester Borough Council Core Strategy Policy ER1
(PDF)
- Size: 91.92 KB
- Estimated download time: (56k = 14 secs)
Consultation on additional Proposed Amendments to Policies
Respondents from the Proposed Submission and Proposed Focused Changes stages were invited to submit comments on an additional four proposed amendments to policies.
Invitation to comment on Proposed Amendments to Policies
(PDF)
- Size: 214.57 KB
- Estimated download time: (56k = 32 secs)
Representation from The Coal Authority
(PDF)
- Size: 45.77 KB
- Estimated download time: (56k = 7 secs)
Representation from The Theatres Trust
(PDF)
- Size: 44.82 KB
- Estimated download time: (56k = 7 secs)
Representation from Anglian Water
(PDF)
- Size: 24.33 KB
- Estimated download time: (56k = 4 secs)
Representation from Savills on behalf of Turnstone Estates Ltd
(PDF)
- Size: 42.5 KB
- Estimated download time: (56k = 7 secs)
Representation from Barton Willmore on behalf of Waitrose Ltd
(PDF)
- Size: 58.41 KB
- Estimated download time: (56k = 9 secs)
Consultation on Proposed Focused Changes - 3rd August to 14th September 2011
As a result of the Core Strategy Examination Hearings, the Council proposes some focused changes to policies CS9 Previously Developed Land Target and CS10 Ipswich Northern Fringe.
Public Notice
(PDF)
- Size: 21.41 KB
- Estimated download time: (56k = 4 secs)
Sustainability Appraisal Update
(PDF)
- Size: 423.27 KB
- Estimated download time: (56k = 1 mins 2 secs)
Suggested changes to policies CS9 and CS10
(PDF)
- Size: 78.64 KB
- Estimated download time: (56k = 12 secs)
Representation Form
(DOC)
- Size: 47.5 KB
- Estimated download time: (56k = 7 secs)
Guidance Note for Representation Form
(PDF)
- Size: 37.85 KB
- Estimated download time: (56k = 6 secs)
Policy CS10 supporting statement
(PDF)
- Size: 12.46 KB
- Estimated download time: (56k = 2 secs)
Consultation on proposed minor amendments 17th August - 14th September
Letter inviting comments on proposed minor amendments
(PDF)
- Size: 161.04 KB
- Estimated download time: (56k = 24 secs)
Matter 1 minor amendments
(PDF)
- Size: 251.99 KB
- Estimated download time: (56k = 37 secs)
Matter 2 minor amendments
(PDF)
- Size: 232.19 KB
- Estimated download time: (56k = 34 secs)
Matter 3 minor amendments
(PDF)
- Size: 245.94 KB
- Estimated download time: (56k = 36 secs)
Matter 5 minor amendments
(PDF)
- Size: 34.81 KB
- Estimated download time: (56k = 6 secs)
Matter 7 minor amendments
(PDF)
- Size: 50.18 KB
- Estimated download time: (56k = 8 secs)
Matter 9 minor amendments
(PDF)
- Size: 59.16 KB
- Estimated download time: (56k = 9 secs)
Matter 10 minor amendments
(PDF)
- Size: 47.84 KB
- Estimated download time: (56k = 7 secs)
Letter from Programme Officer regarding draft NPPF
(PDF)
- Size: 76.27 KB
- Estimated download time: (56k = 12 secs)
Proposals Map - revised July 2011
(PDF)
- Size: 9.59 MB
- Estimated download time: (56k = 23 mins 57 secs)
Consolidated list of minor amendments
(PDF)
- Size: 104.06 KB
- Estimated download time: (56k = 16 secs)
Core Strategy and Policies - Preferred Options November 2007
Core Strategy and Policies
Ipswich Local Development Framework
Core Strategy & Policies - Preferred Options November 2007
(PDF)
- Size: 2.08 MB
- Estimated download time: (56k = 5 mins 12 secs)
Core Strategy and Policies - Proposed Focused Changes and Minor Amendments consultations
Documents relating to the consultations held in August/September 2011.
Summary of Main Issues Raised - September 2011
(PDF)
- Size: 184.16 KB
- Estimated download time: (56k = 27 secs)
Table of Representations on Proposed Focused Changes
(PDF)
- Size: 151.02 KB
- Estimated download time: (56k = 23 secs)
Table of Comments on Minor Amendments
(PDF)
- Size: 55.82 KB
- Estimated download time: (56k = 9 secs)
Full Comments on Minor Amendments
(PDF)
- Size: 2.62 MB
- Estimated download time: (56k = 6 mins 33 secs)
Full Representations on Proposed Focused Changes
(PDF)
- Size: 14.62 MB
- Estimated download time: (56k = 36 mins 30 secs)
Planning Inspector Letter - Sustainability Appraisal
(PDF)
- Size: 58.77 KB
- Estimated download time: (56k = 9 secs)
Reply to Planning Inspector Letter - SA
(PDF)
- Size: 26.69 KB
- Estimated download time: (56k = 4 secs)
Core Strategy and Policies Appropriate Assessment
This report assesses the likely significant impacts of the plan on internationally designated habitats.
Appropriate Assessment September 2009
(PDF)
- Size: 5.99 MB
- Estimated download time: (56k = 14 mins 57 secs)
Appropriate Assessment Addendum May 2011
(PDF)
- Size: 278.4 KB
- Estimated download time: (56k = 41 secs)
Core Strategy and Policies Post Submission Proposed Focused Changes Consultation - Supporting Information
Schedule of Minor Amendments
(PDF)
- Size: 172.18 KB
- Estimated download time: (56k = 26 secs)
Notice of the Proposed Focused Changes
(PDF)
- Size: 87.88 KB
- Estimated download time: (56k = 13 secs)
Housing Figures Topic Paper
(PDF)
- Size: 308.61 KB
- Estimated download time: (56k = 46 secs)
Core Strategy and Policies Proposed Focused Changes Consultation - Representation Form (Word)
(DOC)
- Size: 48 KB
- Estimated download time: (56k = 8 secs)
Core Strategy and Policies Proposed Focused Changes Consultation - Representation Form (PDF)
(PDF)
- Size: 132.84 KB
- Estimated download time: (56k = 20 secs)
Core Strategy Examination Explanatory Meeting
An Explanatory Meeting was held on 15th June to explain the current position of the Examination in light of the Ministerial Statement regarding the abolition of RSS.
Explanatory Meeting Agenda
(PDF)
- Size: 72.83 KB
- Estimated download time: (56k = 11 secs)
Explanatory Meeting Agenda - accompanying letter
(PDF)
- Size: 77.99 KB
- Estimated download time: (56k = 12 secs)
Explanatory Meeting notes
(PDF)
- Size: 112.24 KB
- Estimated download time: (56k = 17 secs)
Explanatory Meeting notes - accompanying letter
(PDF)
- Size: 60.71 KB
- Estimated download time: (56k = 9 secs)
Core Strategy Examination Hearings
Draft Matters, Issues and Questions
(PDF)
- Size: 89.76 KB
- Estimated download time: (56k = 14 secs)
Draft Programme of Hearings for the CURRENT Core Strategy
(PDF)
- Size: 84.95 KB
- Estimated download time: (56k = 13 secs)
Core Strategy Examination Hearings and Pre-Hearing Meeting
Matters and Issues for the Examination
(PDF)
- Size: 90.9 KB
- Estimated download time: (56k = 14 secs)
Pre-Hearing Meeting - Agenda
(PDF)
- Size: 62.05 KB
- Estimated download time: (56k = 10 secs)
Examination Guidance Notes (superseded)
(PDF)
- Size: 127.65 KB
- Estimated download time: (56k = 19 secs)
Draft Programme for Hearings v3 (superseded)
(PDF)
- Size: 109.48 KB
- Estimated download time: (56k = 17 secs)
Examination Guidance Notes
(PDF)
- Size: 127.09 KB
- Estimated download time: (56k = 19 secs)
Notes of Pre-Hearing Meeting
(PDF)
- Size: 127.11 KB
- Estimated download time: (56k = 19 secs)
Draft Programme of Hearings v4 (superseded)
(PDF)
- Size: 109.54 KB
- Estimated download time: (56k = 17 secs)
Options for Programming
(PDF)
- Size: 61.95 KB
- Estimated download time: (56k = 10 secs)
Letter post Pre-Hearing Meeting
(PDF)
- Size: 78.41 KB
- Estimated download time: (56k = 12 secs)
Draft Programme of Hearings v5
(PDF)
- Size: 108.8 KB
- Estimated download time: (56k = 16 secs)
Draft Programme of Hearings v6
(PDF)
- Size: 107.36 KB
- Estimated download time: (56k = 16 secs)
Core Strategy Inspector's Report 17.11.2011
Core Strategy Inspector's Report 17.11.2011
(PDF)
- Size: 969.01 KB
- Estimated download time: (56k = 2 mins 23 secs)
Core Strategy Proposals Map (September 2009)
Core Strategy Proposals Map (September 2009)
(PDF)
- Size: 4.2 MB
- Estimated download time: (56k = 10 mins 30 secs)
Correspondence relating to Core Strategy Examination in Public
Letter of 16th March 2011 - Pre Hearing Meeting Procedural Questions
(PDF)
- Size: 62.63 KB
- Estimated download time: (56k = 10 secs)
Council's Answers to Pre Hearing Meeting Procedural Questions
(PDF)
- Size: 78.95 KB
- Estimated download time: (56k = 12 secs)
Council's Response to letter of 15th March
(PDF)
- Size: 201.38 KB
- Estimated download time: (56k = 30 secs)
Letter to Council 11th April - Budget 2011, Planning for Growth
(PDF)
- Size: 79.46 KB
- Estimated download time: (56k = 12 secs)
Letter to "Part A" Respondents 11th April - Budget 2011, Planning for Growth
(PDF)
- Size: 79.17 KB
- Estimated download time: (56k = 12 secs)
Letter to Council 12th April - SEA directive
(PDF)
- Size: 95.21 KB
- Estimated download time: (56k = 14 secs)
Council's response to Inspector's letter of 11th April
(PDF)
- Size: 378.1 KB
- Estimated download time: (56k = 56 secs)
Council's response to Inspector's letter of 12th April
(PDF)
- Size: 27.72 KB
- Estimated download time: (56k = 5 secs)
Letter of 20th May - Employment Provision
(PDF)
- Size: 103.05 KB
- Estimated download time: (56k = 16 secs)
Letter to Council 1st June - Cala 3 Judgement
(PDF)
- Size: 89.65 KB
- Estimated download time: (56k = 14 secs)
Ipswich Borough Council Statement of Intent
(PDF)
- Size: 215.81 KB
- Estimated download time: (56k = 32 secs)
Council's response to Inspector's letter of 20th May
(PDF)
- Size: 1.46 MB
- Estimated download time: (56k = 3 mins 39 secs)
Council's response to Inspector's letter of 2nd June
(PDF)
- Size: 39.9 KB
- Estimated download time: (56k = 6 secs)
Letter of support from Suffolk Coastal District Council
(PDF)
- Size: 108.96 KB
- Estimated download time: (56k = 16 secs)
Letter of support from Babergh & Mid Suffolk District Councils
(PDF)
- Size: 190.92 KB
- Estimated download time: (56k = 28 secs)
Cala 3 comments - George & Verna Duncan
(PDF)
- Size: 48.07 KB
- Estimated download time: (56k = 8 secs)
Cala 3 comments - Northern Fringe Protection Group
(PDF)
- Size: 34.99 KB
- Estimated download time: (56k = 6 secs)
Cala 3 response - John & Jane Rosher
(PDF)
- Size: 8.72 KB
- Estimated download time: (56k = 2 secs)
Cala 3 comments - Michael Penman
(PDF)
- Size: 59.64 KB
- Estimated download time: (56k = 9 secs)
Cala 3 comments - Crest Nicholson
(PDF)
- Size: 18.42 KB
- Estimated download time: (56k = 3 secs)
Cala 3 comments - Save Our Country Spaces
(PDF)
- Size: 109.84 KB
- Estimated download time: (56k = 17 secs)
Cala 3 comments - Friends, Families & Traveller and Traveller Law Reform Project
(PDF)
- Size: 39.43 KB
- Estimated download time: (56k = 6 secs)
Letter to Council 16th June - Matter 5 Travelling Community
(PDF)
- Size: 94.34 KB
- Estimated download time: (56k = 14 secs)
Council's response to Inspector's letter of 16th June
(PDF)
- Size: 1.77 MB
- Estimated download time: (56k = 4 mins 26 secs)
Suffolk County Council's comments on Inspector's letter of 12th April
(PDF)
- Size: 1011.55 KB
- Estimated download time: (56k = 2 mins 29 secs)
- Size: 384.24 KB
- Estimated download time: (56k = 57 secs)
Cala 3 comments - JB Planning Associates
(PDF)
- Size: 78.26 KB
- Estimated download time: (56k = 12 secs)
Correspondence relating to Suspension of Core Strategy Examination
Due to the recent turn of events, the Inspector has decided to suspend the examination into the Core Strategy and Policies for five months from 30th July 2010.
Letter from Council to Programme Officer 22nd July 2010
(PDF)
- Size: 34.39 KB
- Estimated download time: (56k = 6 secs)
Response from Programme Officer to Council 30th July 2010
(PDF)
- Size: 80.39 KB
- Estimated download time: (56k = 12 secs)
Letter from Council to Programme Officer 7th September 2010
(PDF)
- Size: 41.95 KB
- Estimated download time: (56k = 7 secs)
Correspondence relating to the abolition of regional strategies
The decision by the Secretary of State to abolish Regional Strategies has led to the postponement of the scheduled Core Strategy examination hearings.
Letter from Secretary of State 27.05.10 - intention to abolish regional spatial strategies
(PDF)
- Size: 170.45 KB
- Estimated download time: (56k = 25 secs)
Core Strategy Examination Inspector's letter 09.06.10
(PDF)
- Size: 75.49 KB
- Estimated download time: (56k = 12 secs)
Ipswich Borough Council's response to Inspector 09.06.10
(PDF)
- Size: 440.04 KB
- Estimated download time: (56k = 1 mins 5 secs)
Letter from Secretary of State 06.07.10 - regional spatial strategies revoked
(PDF)
- Size: 93.69 KB
- Estimated download time: (56k = 14 secs)
- Size: 125.21 KB
- Estimated download time: (56k = 19 secs)
Correspondence relating to the Proposed Focus Changes consultation
On 27th October 2010, the Council decided to make focused changes to the Core Strategy and Policies DPD and consult on these changes before resuming the Examination process.
Letter from Council to Programme Officer 1st November 2010
(PDF)
- Size: 228.75 KB
- Estimated download time: (56k = 34 secs)
Programme Officer's reply 4th November 2010
(PDF)
- Size: 145.93 KB
- Estimated download time: (56k = 22 secs)
Letter from Council to Programme Officer 26th November 2010
(PDF)
- Size: 77.85 KB
- Estimated download time: (56k = 12 secs)
Letter from Council to Programme Officer 8th December 2010
(PDF)
- Size: 30.44 KB
- Estimated download time: (56k = 5 secs)
Programme Officer's reply 10th December 2010
(PDF)
- Size: 131.54 KB
- Estimated download time: (56k = 20 secs)
Acknowledgment letter from Council to Programme Officer 22nd December 2010
(PDF)
- Size: 257.78 KB
- Estimated download time: (56k = 38 secs)
List of Questions from the Inspector - December 2010
(PDF)
- Size: 100.58 KB
- Estimated download time: (56k = 15 secs)
Response to Inspector's questions - 31st January 2011
(PDF)
- Size: 476.87 KB
- Estimated download time: (56k = 1 mins 11 secs)
Response to Inspector's questions - February 2011
(PDF)
- Size: 312.92 KB
- Estimated download time: (56k = 46 secs)
Letter from Programme Officer 3rd March 2011 - Soundness of Focused Changes to Core Strategy
(PDF)
- Size: 130.2 KB
- Estimated download time: (56k = 20 secs)
Letter from Council to Programme Officer - 8th March 2011
(PDF)
- Size: 931.82 KB
- Estimated download time: (56k = 2 mins 17 secs)
Letter of 15th March 2011 - Cross Boundary Working
(PDF)
- Size: 110.79 KB
- Estimated download time: (56k = 17 secs)
Council's Further Topic Paper on Employment
Council's Further Topic Paper on Employment
(PDF)
- Size: 4.16 MB
- Estimated download time: (56k = 10 mins 24 secs)
Council's response to letter from Mrs Robinson
Core Document Library ref: ECD06
Council's response to letter from Mrs Robinson
(PDF)
- Size: 46.13 KB
- Estimated download time: (56k = 7 secs)
Culture and Leisure needs analysis
This analysis report has been produced by pmpgenesis as part of the Council's review of it's cultural strategy.
Culture and Leisure needs analysis
(PDF)
- Size: 8.34 MB
- Estimated download time: (56k = 20 mins 50 secs)
Appendices
(PDF)
- Size: 715.83 KB
- Estimated download time: (56k = 1 mins 45 secs)
Draft Ipswich Strategic Flood Risk Assessment (Level 2) - Superseded
PLEASE NOTE this is a draft document that has now been superseded by the final report.
Draft Ipswich Strategic Flood Risk Assessment (Level 2) - main report
(PDF)
- Size: 11.33 MB
- Estimated download time: (56k = 28 mins 17 secs)
Draft SFRA (Level 2) - Appendices 2 - 5.4
(PDF)
- Size: 5.5 MB
- Estimated download time: (56k = 13 mins 45 secs)
Draft SFRA (Level 2) - Appendices 5.7 - 5.17
(PDF)
- Size: 11.92 MB
- Estimated download time: (56k = 29 mins 47 secs)
Draft SFRA (Level 2) - Appendices 5.18 - 5.24
(PDF)
- Size: 10.1 MB
- Estimated download time: (56k = 25 mins 14 secs)
Draft SFRA (Level 2) - Appendices 5.25 - 5.30
(PDF)
- Size: 10.26 MB
- Estimated download time: (56k = 25 mins 38 secs)
Draft Playing Pitch Strategy
Draft Playing Pitch Strategy
(PDF)
- Size: 342.45 KB
- Estimated download time: (56k = 51 secs)
Draft Suffolk Haven Gateway Employment Land Review and Strategic Sites Study
This interim draft report was part of the evidence base at the Proposed Submission Core Strategy consultation stage in September 2009. The final report has now been published and is available to view
Draft Suffolk Haven Gateway Employment Land Review and Strategic Sites Study
(PDF)
- Size: 5.54 MB
- Estimated download time: (56k = 13 mins 50 secs)
East of England Plan
East of England Plan
(PDF)
- Size: 2.28 MB
- Estimated download time: (56k = 5 mins 42 secs)
ECD12 - Policy CS10 Supporting Statement
ECD12 - Policy CS10 Supporting Statement
(PDF)
- Size: 75.48 KB
- Estimated download time: (56k = 12 secs)
EERA Letter of Conformity
EERA Letter of Conformity
(PDF)
- Size: 29.33 KB
- Estimated download time: (56k = 5 secs)
EERA Report - ACD16
EERA Report - ACD16
(PDF)
- Size: 151.65 KB
- Estimated download time: (56k = 23 secs)
EiP RSS Single Issue Review, EERA submission Matter 1A: Overall Regional Need and Deliverability
Core Document Library ref: PCD95
EiP RSS Single Issue Review, EERA submission Matter 1A: Overall Regional Need and Deliverability
(PDF)
- Size: 67.8 KB
- Estimated download time: (56k = 10 secs)
Flood Risk Sequential Statement
Core Document Library ref: PCD87
Flood Risk Sequential Statement
(PDF)
- Size: 40.26 KB
- Estimated download time: (56k = 6 secs)
Gypsy and Traveller Accommodation Topic Paper 2
Gypsy and Traveller Accommodation Topic Paper 2
(PDF)
- Size: 126.09 KB
- Estimated download time: (56k = 19 secs)
Haven Gateway Integrated Development Programme
Core Document Library ref: SCD02
Haven Gateway Integrated Development Programme
(PDF)
- Size: 3.66 MB
- Estimated download time: (56k = 9 mins 9 secs)
Haven Gateway Water Cycle Study Stage 2 (Suffolk Districts)
Haven Gateway Water Cycle Study Stage 2 (Suffolk Districts)
(PDF)
- Size: 10.57 MB
- Estimated download time: (56k = 26 mins 23 secs)
Haven Gateway Water Cycle Study Stage 2 (Suffolk Districts)
Haven Gateway Water Cycle Study Stage 2 (Suffolk Districts)
(PDF)
- Size: 10.57 MB
- Estimated download time: (56k = 26 mins 23 secs)
Hearing Statements - Matter 1
Hearing to be held on Tuesday 12th July 2011 at 09:30
Matter 1 - Barratt Strategic
(PDF)
- Size: 166.81 KB
- Estimated download time: (56k = 25 secs)
Matter 1 - Ipswich Borough Council
(PDF)
- Size: 186.99 KB
- Estimated download time: (56k = 28 secs)
Matter 1 - Ipswich Borough Council (Statement of Common Ground & Flood Risk Sequential Statement)
(PDF)
- Size: 817.94 KB
- Estimated download time: (56k = 2 mins 0 secs)
Matter 1 - Ipswich School
(PDF)
- Size: 49.83 KB
- Estimated download time: (56k = 8 secs)
Matter 1 - Mersea Homes
(PDF)
- Size: 109.75 KB
- Estimated download time: (56k = 17 secs)
Matter 1 - Cycle Ipswich
(PDF)
- Size: 110.84 KB
- Estimated download time: (56k = 17 secs)
Matter 1 - Northern Fringe Protection Group
(PDF)
- Size: 147.6 KB
- Estimated download time: (56k = 22 secs)
Matter 1 - Save Our Country Spaces
(PDF)
- Size: 155.24 KB
- Estimated download time: (56k = 23 secs)
Matter 1 - Crest Nicholson
(PDF)
- Size: 54.95 KB
- Estimated download time: (56k = 9 secs)
Matter 1 - Suffolk Mental Health NHS Trust
(PDF)
- Size: 1.71 MB
- Estimated download time: (56k = 4 mins 17 secs)
Matter 1 - Environment Agency
(PDF)
- Size: 64.27 KB
- Estimated download time: (56k = 10 secs)
Matter 1 - Note of meeting to discuss Sustainability Appraisal
(PDF)
- Size: 72.38 KB
- Estimated download time: (56k = 11 secs)
Matter 1 - Building Partnerships Ltd and Taylor Wimpey UK
(PDF)
- Size: 77.93 KB
- Estimated download time: (56k = 12 secs)
Hearing Statements - Matter 10
Hearing to be held on Wednesday 20th July 2011 at 09:30
Matter 10 - Cycle Ipswich
(PDF)
- Size: 35.85 KB
- Estimated download time: (56k = 6 secs)
Matter 10 - Ipswich Borough Council
(PDF)
- Size: 221.73 KB
- Estimated download time: (56k = 33 secs)
Matter 10 - Ipswich Borough Council (Statement of Common Ground)
(PDF)
- Size: 780.34 KB
- Estimated download time: (56k = 1 mins 56 secs)
Matter 10 - Mersea Homes
(PDF)
- Size: 26.76 KB
- Estimated download time: (56k = 4 secs)
Matter 10 - Suffolk Mental Health Partnership NHS Trust
(PDF)
- Size: 579.75 KB
- Estimated download time: (56k = 1 mins 26 secs)
Matter 10 - Crest Nicholson
(PDF)
- Size: 63.69 KB
- Estimated download time: (56k = 10 secs)
Matter 10 - Environment Agency
(PDF)
- Size: 6.59 MB
- Estimated download time: (56k = 16 mins 29 secs)
Hearing Statements - Matter 11
Hearing to be held on Wednesday 11th May at 14:00
Matter 11 - Crest Nicholson
(PDF)
- Size: 1.04 MB
- Estimated download time: (56k = 2 mins 38 secs)
Matter 11 - Ipswich Borough Council
(PDF)
- Size: 48.24 KB
- Estimated download time: (56k = 8 secs)
Matter 11 - Mersea Homes
(PDF)
- Size: 8.37 KB
- Estimated download time: (56k = 2 secs)
Further comments on Part A changes - Crest Nicholson
(PDF)
- Size: 38.27 KB
- Estimated download time: (56k = 6 secs)
Hearing Statements - Matter 2
Hearing to be held on Thursday 14th July 2011 at 09:30
Matter 2 - Barratt Strategic
(PDF)
- Size: 112.52 KB
- Estimated download time: (56k = 17 secs)
Matter 2 - Crest Nicholson
(PDF)
- Size: 5.69 MB
- Estimated download time: (56k = 14 mins 14 secs)
Matter 2 - Cycle Ipswich
(PDF)
- Size: 32.92 KB
- Estimated download time: (56k = 5 secs)
Matter 2 - Ipswich Borough Council
(PDF)
- Size: 215.69 KB
- Estimated download time: (56k = 32 secs)
Matter 2 - Ipswich Borough Council (Statement of Common Ground)
(PDF)
- Size: 780.34 KB
- Estimated download time: (56k = 1 mins 56 secs)
Matter 2 - Ipswich School
(PDF)
- Size: 33.24 KB
- Estimated download time: (56k = 5 secs)
Matter 2 - Mersea Homes
(PDF)
- Size: 51.59 KB
- Estimated download time: (56k = 8 secs)
Matter 2 - Northern Fringe Protection Group
(PDF)
- Size: 114.98 KB
- Estimated download time: (56k = 17 secs)
Matter 2 - Save Our Country Spaces
(PDF)
- Size: 63.33 KB
- Estimated download time: (56k = 10 secs)
Matter 2 - Suffolk Mental Health Partnership NHS Trust
(PDF)
- Size: 1.71 MB
- Estimated download time: (56k = 4 mins 17 secs)
Matter 2 - Suffolk Mental Health Partnership NHS Trust (Statement of Common Ground)
(PDF)
- Size: 579.76 KB
- Estimated download time: (56k = 1 mins 26 secs)
Matter 2 - Environment Agency
(PDF)
- Size: 29.94 KB
- Estimated download time: (56k = 5 secs)
Hearing Statements - Matter 3
Hearing to be held on Tuesday 19th July 2011 at 09:30
Matter 3 - Barratt Strategic
(PDF)
- Size: 193.86 KB
- Estimated download time: (56k = 29 secs)
Matter 3 - Crest Nicholson
(PDF)
- Size: 1.27 MB
- Estimated download time: (56k = 3 mins 11 secs)
Matter 3 - Cycle Ipswich
(PDF)
- Size: 37.13 KB
- Estimated download time: (56k = 6 secs)
Matter 3 - Ipswich Borough Council
(PDF)
- Size: 221.27 KB
- Estimated download time: (56k = 33 secs)
Matter 3 - Ipswich Borough Council (Statement of Common Ground)
(PDF)
- Size: 780.34 KB
- Estimated download time: (56k = 1 mins 56 secs)
Matter 3 - Ipswich School
(PDF)
- Size: 41.69 KB
- Estimated download time: (56k = 7 secs)
Matter 3 - Mersea Homes
(PDF)
- Size: 41.73 KB
- Estimated download time: (56k = 7 secs)
Matter 3 - Northern Fringe Protection Group
(PDF)
- Size: 123.77 KB
- Estimated download time: (56k = 19 secs)
Matter 3 - Save Our Country Spaces
(PDF)
- Size: 62.86 KB
- Estimated download time: (56k = 10 secs)
Matter 3 - Environment Agency
(PDF)
- Size: 38.68 KB
- Estimated download time: (56k = 6 secs)
Hearing Statements - Matter 4
Hearing to be held on Tuesday 10th May at 09:30
Matter 4 - Crest Nicholson
(PDF)
- Size: 281.52 KB
- Estimated download time: (56k = 42 secs)
Matter 4 - Ipswich Borough Council
(PDF)
- Size: 49.69 KB
- Estimated download time: (56k = 8 secs)
Matter 4 - Mersea Homes
(PDF)
- Size: 18.19 KB
- Estimated download time: (56k = 3 secs)
Matter 4 - National Health Service
(PDF)
- Size: 1.71 MB
- Estimated download time: (56k = 4 mins 17 secs)
Further comments on Part A changes - Ipswich Borough Council
(PDF)
- Size: 64.87 KB
- Estimated download time: (56k = 10 secs)
Further comments on Part A changes - Mersea Homes
(PDF)
- Size: 28.67 KB
- Estimated download time: (56k = 5 secs)
Further comments on Part A changes - National Health Service
(PDF)
- Size: 947.29 KB
- Estimated download time: (56k = 2 mins 20 secs)
Hearing Statements - Matter 5
Hearing to be held on Thursday 21st July at 14:00
Matter 5 - Ipswich Borough Council
(PDF)
- Size: 194.41 KB
- Estimated download time: (56k = 29 secs)
Matter 5 - Ipswich Borough Council (Statement of Common Ground)
(PDF)
- Size: 507.99 KB
- Estimated download time: (56k = 1 mins 15 secs)
Hearing Statements - Matter 6
Hearing to be held on Tuesday 10th May at 14:00
Matter 6 - Crest Nicholson
(PDF)
- Size: 1.64 MB
- Estimated download time: (56k = 4 mins 8 secs)
Matter 6 - Environment Agency
(PDF)
- Size: 102.28 KB
- Estimated download time: (56k = 15 secs)
Matter 6 - Ipswich Borough Council
(PDF)
- Size: 63.52 KB
- Estimated download time: (56k = 10 secs)
Matter 6 - Mersea Homes
(PDF)
- Size: 16.35 KB
- Estimated download time: (56k = 3 secs)
Matter 6 - Natural England
(PDF)
- Size: 5.23 MB
- Estimated download time: (56k = 13 mins 3 secs)
Matter 6 - Northern Fringe Protection Group
(PDF)
- Size: 978.69 KB
- Estimated download time: (56k = 2 mins 24 secs)
Matter 6 - Save Our Country Spaces
(PDF)
- Size: 674.57 KB
- Estimated download time: (56k = 1 mins 39 secs)
Matter 6 - Transition Ipswich
(PDF)
- Size: 591.37 KB
- Estimated download time: (56k = 1 mins 27 secs)
Hearing Statements - Matter 7
Hearing to be held on Wednesday 13th July 2011 at 09:30
Matter 7 - AquiGen / BDO Stoy Hayward
(PDF)
- Size: 2.68 MB
- Estimated download time: (56k = 6 mins 42 secs)
Matter 7 - Ashfield Land
(PDF)
- Size: 26.09 KB
- Estimated download time: (56k = 4 secs)
Matter 7 - Ipswich Borough Council
(PDF)
- Size: 199.46 KB
- Estimated download time: (56k = 30 secs)
Matter 7 - Mersea Homes
(PDF)
- Size: 22.01 KB
- Estimated download time: (56k = 4 secs)
Matter 7 - Northern Fringe Protection Group
(PDF)
- Size: 334.15 KB
- Estimated download time: (56k = 49 secs)
Matter 7 - Crest Nicholson
(PDF)
- Size: 23 KB
- Estimated download time: (56k = 4 secs)
Matter 7 - AquiGen (Statement of Common Ground)
(PDF)
- Size: 5.03 MB
- Estimated download time: (56k = 12 mins 35 secs)
Hearing Statements - Matter 8
Hearing to be held on Wednesday 11th May at 09:30
Matter 8 - Crest Nicholson
(PDF)
- Size: 1.12 MB
- Estimated download time: (56k = 2 mins 48 secs)
Matter 8 - Ipswich Borough Council
(PDF)
- Size: 57.7 KB
- Estimated download time: (56k = 9 secs)
Matter 8 - Legal & General
(PDF)
- Size: 179.44 KB
- Estimated download time: (56k = 27 secs)
Matter 8 - Mersea Homes
(PDF)
- Size: 12.43 KB
- Estimated download time: (56k = 2 secs)
Matter 8 - Waitrose
(PDF)
- Size: 91.67 KB
- Estimated download time: (56k = 14 secs)
Further comments on Part A changes - Crest Nicholson
(PDF)
- Size: 42.55 KB
- Estimated download time: (56k = 7 secs)
Further comments on Part A changes - Mersea Homes
(PDF)
- Size: 19.78 KB
- Estimated download time: (56k = 3 secs)
Hearing Statements - Matter 9
Hearing to be held on Thursday 21st July 2011 at 09:30
Matter 9 - Ashfield Land
(PDF)
- Size: 31.03 KB
- Estimated download time: (56k = 5 secs)
Matter 9 - Cycle Ipswich
(PDF)
- Size: 475.29 KB
- Estimated download time: (56k = 1 mins 11 secs)
Matter 9 - Ipswich Borough Council
(PDF)
- Size: 193.83 KB
- Estimated download time: (56k = 29 secs)
Matter 9 - Mersea Homes
(PDF)
- Size: 16.15 KB
- Estimated download time: (56k = 3 secs)
Matter 9 - Northern Fringe Protection Group
(PDF)
- Size: 153.6 KB
- Estimated download time: (56k = 23 secs)
Matter 9 - Crest Nicholson
(PDF)
- Size: 402.78 KB
- Estimated download time: (56k = 59 secs)
Matter 9 - Ipswich Borough Council (Statement of Common Ground)
(PDF)
- Size: 50.56 KB
- Estimated download time: (56k = 8 secs)
Matter 9 - Ipswich Borough Council (Addendum to Statement of Common Ground)
(PDF)
- Size: 94.52 KB
- Estimated download time: (56k = 14 secs)
ICD48 Whitton Conservation Area Appraisal
ICD 48 Whitton Conservation Area Appraisal
(PDF)
- Size: 781.5 KB
- Estimated download time: (56k = 1 mins 56 secs)
ICD49 Christchurch Street Conservation Area Appraisal
ICD 49 Christchurch Street Conservation Area Appraisal
(PDF)
- Size: 1.13 MB
- Estimated download time: (56k = 2 mins 50 secs)
ICD50 Park Conservation Area Appraisal
ICD 50 Park Conservation Area Appraisal
(PDF)
- Size: 1.62 MB
- Estimated download time: (56k = 4 mins 3 secs)
ICD51 Central Conservation Area Appraisal
ICD 51 Central Conservation Area Appraisal
(PDF)
- Size: 2.2 MB
- Estimated download time: (56k = 5 mins 32 secs)
ICD52 Stoke Conservation Area Appraisal
ICD 52 Stoke Conservation Area Appraisal
(PDF)
- Size: 2.84 MB
- Estimated download time: (56k = 7 mins 5 secs)
ICD53 Norwich Road - Anglesea Road Conservation Area Appraisal
ICD 53 Norwich Road - Anglesea Road Conservation Area Appraisal
(PDF)
- Size: 4.63 MB
- Estimated download time: (56k = 11 mins 35 secs)
ICD54 Issues and Options Issues Considered 2006
ICD 54 Issues and Options Issues Considered 2006
(PDF)
- Size: 7.51 KB
- Estimated download time: (56k = 2 secs)
ICD55 UCS Estate Development Strategy
ICD 55 UCS Estate Development Strategy
(PDF)
- Size: 905.93 KB
- Estimated download time: (56k = 2 mins 14 secs)
ICD57 Saved Local Plan Policies
ICD 57 Saved Local Plan Policies
(PDF)
- Size: 282.04 KB
- Estimated download time: (56k = 42 secs)
ICD58 Urban Capacity Study
ICD58 Urban Capacity Study
(PDF)
- Size: 118.34 KB
- Estimated download time: (56k = 18 secs)
ICD60 SA Scoping Report 06
ICD60 SA Scoping Report 06
(PDF)
- Size: 10.48 MB
- Estimated download time: (56k = 26 mins 11 secs)
ICD61 SEA Consultation 05
ICD61 SEA Consultation 05
(PDF)
- Size: 3.8 MB
- Estimated download time: (56k = 9 mins 30 secs)
ICD62 RAG River Strategy
ICD62 RAG River Strategy
(PDF)
- Size: 9.23 MB
- Estimated download time: (56k = 23 mins 5 secs)
Interim Draft Ipswich Retail and Commercial Leisure Study
Interim Draft Ipswich Retail and Commercial Leisure Study
(PDF)
- Size: 4.55 MB
- Estimated download time: (56k = 11 mins 23 secs)
IP-One Area Action Plan Proposals Map
Preferred Options IP-One Area Action Plan - Proposals Map
(PDF)
- Size: 5.78 MB
- Estimated download time: (56k = 14 mins 26 secs)
Ipswich Borough Council Housing Trajectory
Ipswich Borough Council Housing Trajectory
Ipswich Borough Council Housing Trajectory (as at January 2010)
(PDF)
- Size: 157.46 KB
- Estimated download time: (56k = 24 secs)
Ipswich Borough Council Housing Trajectory (as at April 2010)
(PDF)
- Size: 143.05 KB
- Estimated download time: (56k = 21 secs)
Ipswich Cultural Strategy 2011-2014
Core Document Library ref: PCD90
Ipswich Cultural Strategy 2011-2014
(PDF)
- Size: 91.06 KB
- Estimated download time: (56k = 14 secs)
Ipswich Definitive Map
Ipswich Definitive Map - East
(PDF)
- Size: 1.93 MB
- Estimated download time: (56k = 4 mins 50 secs)
Ipswich Definitive Map - West
(PDF)
- Size: 2.09 MB
- Estimated download time: (56k = 5 mins 14 secs)
Ipswich Flood Defence Management Scheme Tidal Barrier Works
Ipswich Flood Defence Management Scheme Tidal Barrier Works
(PDF)
- Size: 1.46 MB
- Estimated download time: (56k = 3 mins 39 secs)
Ipswich Flood Defence Management Strategy
Ipswich Flood Defence Management Strategy
(PDF)
- Size: 14.63 MB
- Estimated download time: (56k = 36 mins 33 secs)
Ipswich Local Investment Plan
The purpose of Ipswich LIP is to guide investment by the Homes and Communities Agency, and other partners in housing and regeneration in the Ipswich area.
Ipswich Local Investment Plan
(PDF)
- Size: 1.48 MB
- Estimated download time: (56k = 3 mins 42 secs)
Ipswich Local List
Unfortunately this document is too large to download, however it is available in paper form at the One-Ipswich Customer Service Centre, Grafton House, Central Library and Whitehouse Library.
Ipswich Local List - front cover
(PDF)
- Size: 1.65 MB
- Estimated download time: (56k = 4 mins 8 secs)
Ipswich Renewable Energy and Sustainable Construction Viability Study
Ipswich Renewable Energy and Sustainable Construction Viability Study
(PDF)
- Size: 684.35 KB
- Estimated download time: (56k = 1 mins 41 secs)
Ipswich Strategic Housing Land Availability Assessment (SHLAA)
Strategic Housing Land Availability Assessment (SHLAA) - final report March 2010
(PDF)
- Size: 984.26 KB
- Estimated download time: (56k = 2 mins 24 secs)
SHLAA site sheets IP001 - IP010
(PDF)
- Size: 1.71 MB
- Estimated download time: (56k = 4 mins 17 secs)
SHLAA site sheets IP011 - IP020b
(PDF)
- Size: 1.81 MB
- Estimated download time: (56k = 4 mins 32 secs)
SHLAA site sheets IP021 - IP030
(PDF)
- Size: 1.67 MB
- Estimated download time: (56k = 4 mins 11 secs)
SHLAA site sheets IP031 - IP040
(PDF)
- Size: 2.3 MB
- Estimated download time: (56k = 5 mins 44 secs)
SHLAA site sheets IP041 - IP050
(PDF)
- Size: 3.47 MB
- Estimated download time: (56k = 8 mins 41 secs)
SHLAA site sheets IP051 - IP060
(PDF)
- Size: 3.91 MB
- Estimated download time: (56k = 9 mins 47 secs)
SHLAA site sheets IP061 - IP070
(PDF)
- Size: 3.97 MB
- Estimated download time: (56k = 9 mins 56 secs)
SHLAA site sheets IP071 - IP080
(PDF)
- Size: 3.23 MB
- Estimated download time: (56k = 8 mins 5 secs)
SHLAA site sheets IP081 - IP090
(PDF)
- Size: 4.07 MB
- Estimated download time: (56k = 10 mins 11 secs)
SHLAA site sheets IP091 - IP100
(PDF)
- Size: 3.66 MB
- Estimated download time: (56k = 9 mins 9 secs)
SHLAA site sheets IP101 - IP110
(PDF)
- Size: 3.95 MB
- Estimated download time: (56k = 9 mins 53 secs)
SHLAA site sheets IP111 - IP120
(PDF)
- Size: 3.98 MB
- Estimated download time: (56k = 9 mins 57 secs)
SHLAA site sheets IP121 - IP130
(PDF)
- Size: 3.67 MB
- Estimated download time: (56k = 9 mins 11 secs)
SHLAA site sheets IP131 - IP140
(PDF)
- Size: 3.69 MB
- Estimated download time: (56k = 9 mins 14 secs)
SHLAA site sheets IP141 - IP150
(PDF)
- Size: 4.54 MB
- Estimated download time: (56k = 11 mins 21 secs)
SHLAA site sheets IP151 - IP159
(PDF)
- Size: 3.31 MB
- Estimated download time: (56k = 8 mins 17 secs)
SHLAA site sheets IP160 - IP170
(PDF)
- Size: 3.92 MB
- Estimated download time: (56k = 9 mins 47 secs)
SHLAA site sheets IP171 - IP180
(PDF)
- Size: 3.29 MB
- Estimated download time: (56k = 8 mins 14 secs)
SHLAA site sheets IP181 - IP188
(PDF)
- Size: 3.1 MB
- Estimated download time: (56k = 7 mins 45 secs)
Ipswich Transport Model Assessment
Ipswich Transport Model Assessment - part 1
(PDF)
- Size: 12.58 MB
- Estimated download time: (56k = 31 mins 26 secs)
Ipswich Transport Model Assessment - part 2
(PDF)
- Size: 13.33 MB
- Estimated download time: (56k = 33 mins 18 secs)
Ipswich Transport Model Assessment - part 3
(PDF)
- Size: 13.57 MB
- Estimated download time: (56k = 33 mins 53 secs)
Ipswich Transport Model Assessment - part 4
(PDF)
- Size: 4.45 MB
- Estimated download time: (56k = 11 mins 8 secs)
Ipswich Urban Design Policies Viability Study
Ipswich Urban Design Policies Viability Study
(PDF)
- Size: 254.62 KB
- Estimated download time: (56k = 38 secs)
Ipswich Wildlife Audit
Ipswich Wildlife Audit
(PDF)
- Size: 14.3 MB
- Estimated download time: (56k = 35 mins 44 secs)
Keeping you up to date with the Ipswich Local Plan
These newsletters are published regularly in order to update you on the progress of the Ipswich Local Plan (formerly Local Development Framework).
Keeping you up to date with the Ipswich Local Development Framework - Edition 1 (February 2010)
(PDF)
- Size: 299.19 KB
- Estimated download time: (56k = 44 secs)
Keeping you up to date with the Ipswich Local Development Framework - Edition 2 (June 2010)
(PDF)
- Size: 288.16 KB
- Estimated download time: (56k = 43 secs)
Keeping you up to date with the Ipswich Local Development Framework - Edition 3 (October 2010)
(PDF)
- Size: 78.38 KB
- Estimated download time: (56k = 12 secs)
Keeping you up to date with the Ipswich Local Development Framework - Edition 4 (March 2011)
(PDF)
- Size: 101.82 KB
- Estimated download time: (56k = 15 secs)
Keeping you up to date with the Ipswich Local Plan - Edition 5 (May 2012)
(PDF)
- Size: 36.59 KB
- Estimated download time: (56k = 6 secs)
LDF: Further Issues and Options Consultation Paper - February/March 2007
Local Development Framework
Further Issues & Options Consultation
February/March 2007
Further Issues and Options Consultation Paper: February/March 2007
(PDF)
- Size: 56.78 KB
- Estimated download time: (56k = 9 secs)
Appendix 1: Additional Sites 71-76
(PDF)
- Size: 2.49 MB
- Estimated download time: (56k = 6 mins 14 secs)
Appendix 1: Additional Sites 77-82
(PDF)
- Size: 4.04 MB
- Estimated download time: (56k = 10 mins 5 secs)
Appendix 1: Additional Sites 83-88
(PDF)
- Size: 2.33 MB
- Estimated download time: (56k = 5 mins 50 secs)
Appendix 1: Additional Sites 89-95
(PDF)
- Size: 2.3 MB
- Estimated download time: (56k = 5 mins 47 secs)
Appendix 1: Additional Sites 96-101
(PDF)
- Size: 2.39 MB
- Estimated download time: (56k = 5 mins 59 secs)
Appendix 1: Additional Sites 102-108
(PDF)
- Size: 2.49 MB
- Estimated download time: (56k = 6 mins 14 secs)
LDF: Initial Reg 25 Consultation Papers - 2005
Local Development Framework Initial Reg 25 Consultation - 2005
Initial Reg 25 Consultation - Core Strategy
(PDF)
- Size: 42.52 KB
- Estimated download time: (56k = 7 secs)
Initial Reg 25 Consultation - Requirements for Residential Developments
(PDF)
- Size: 41.65 KB
- Estimated download time: (56k = 7 secs)
Initial Reg 25 Consultation - IP-One Area Action Plan
(PDF)
- Size: 149.72 KB
- Estimated download time: (56k = 22 secs)
Initial Reg 25 Consultation - Site Allocations & Policies
(PDF)
- Size: 42.44 KB
- Estimated download time: (56k = 7 secs)
Initial Reg 25 Consultation - Summary of Comments
(PDF)
- Size: 50.11 KB
- Estimated download time: (56k = 8 secs)
LDF: Issues & Options Comment Analysis Papers
Local Development Framework Issues & Options Consultation June-July 2006
Issues & Options: Core Strategy Comment Analysis Paper
(PDF)
- Size: 83.7 KB
- Estimated download time: (56k = 13 secs)
Issues & Options: Requirements for Residential Developments Comment Analysis Paper
(PDF)
- Size: 61.4 KB
- Estimated download time: (56k = 9 secs)
Issues & Options: IP-One Area Action Plan Comment Analysis Paper
(PDF)
- Size: 100.54 KB
- Estimated download time: (56k = 15 secs)
Issues & Options: Site Allocations and Policies Comment Analysis Paper
(PDF)
- Size: 71.58 KB
- Estimated download time: (56k = 11 secs)
Issues & Options: Comments on Sites
(PDF)
- Size: 98.68 KB
- Estimated download time: (56k = 15 secs)
Issues & Options: Suggestions for New Sites
(PDF)
- Size: 17.48 KB
- Estimated download time: (56k = 3 secs)
LDF: Issues & Options Consultation Responses
Local Development Framework Issues & Options June-July 2006
Issues & Options Respondent Numbers
(PDF)
- Size: 51.97 KB
- Estimated download time: (56k = 8 secs)
Consultation Responses: Surnames A to L
(PDF)
- Size: 1.09 MB
- Estimated download time: (56k = 2 mins 44 secs)
Consultation Responses: Surnames M to Z
(PDF)
- Size: 652.22 KB
- Estimated download time: (56k = 1 mins 36 secs)
Consultation Responses: Core Strategy and Policies
(PDF)
- Size: 627.5 KB
- Estimated download time: (56k = 1 mins 32 secs)
Consultation Responses: Requirements for Residential Developments
(PDF)
- Size: 276.83 KB
- Estimated download time: (56k = 41 secs)
Consultation Responses: Not relating directly to any specific local development document
(PDF)
- Size: 22.29 KB
- Estimated download time: (56k = 4 secs)
Consultation Responses: Site Allocations and Policies
(PDF)
- Size: 603.87 KB
- Estimated download time: (56k = 1 mins 29 secs)
Consultation Responses: IP-One Area Action Plan
(PDF)
- Size: 198.05 KB
- Estimated download time: (56k = 29 secs)
LDF: Issues and Options Consultation Documents - June 2006
Local Development Framework Issues & Options June/July 2006
Issues and Options: Core Strategy & Policies
(PDF)
- Size: 69.28 KB
- Estimated download time: (56k = 11 secs)
Issues and Options: Requirements for Residential Developments
(PDF)
- Size: 134.4 KB
- Estimated download time: (56k = 20 secs)
Issues and Options: IP-One Area Action Plan
(PDF)
- Size: 94.63 KB
- Estimated download time: (56k = 14 secs)
Issues and Options: IP-One Area Map
(PDF)
- Size: 1.8 MB
- Estimated download time: (56k = 4 mins 30 secs)
Issues and Options: Site Allocations & Policies
(PDF)
- Size: 81.19 KB
- Estimated download time: (56k = 12 secs)
Issues and Options: Site Allocations & Policies Appendix A (text)
(PDF)
- Size: 47.21 KB
- Estimated download time: (56k = 7 secs)
Issues and Options: Site Allocations Issue 5 - Major Greenfield Development Sites Map
(PDF)
- Size: 175.08 KB
- Estimated download time: (56k = 26 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 1 to 4)
(PDF)
- Size: 961.93 KB
- Estimated download time: (56k = 2 mins 21 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 5 to 9)
(PDF)
- Size: 1.69 MB
- Estimated download time: (56k = 4 mins 14 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 10 to 13)
(PDF)
- Size: 1.02 MB
- Estimated download time: (56k = 2 mins 33 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 14 to 17)
(PDF)
- Size: 1.1 MB
- Estimated download time: (56k = 2 mins 45 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 18 to 20)
(PDF)
- Size: 830.15 KB
- Estimated download time: (56k = 2 mins 2 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 21 & 22)
(PDF)
- Size: 677.01 KB
- Estimated download time: (56k = 1 mins 41 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 23 to 25)
(PDF)
- Size: 901.16 KB
- Estimated download time: (56k = 2 mins 12 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 26 & 27)
(PDF)
- Size: 586.3 KB
- Estimated download time: (56k = 1 mins 26 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 28 to 31)
(PDF)
- Size: 1.19 MB
- Estimated download time: (56k = 2 mins 59 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 32 to 34)
(PDF)
- Size: 1.01 MB
- Estimated download time: (56k = 2 mins 32 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 35 to 38)
(PDF)
- Size: 1.34 MB
- Estimated download time: (56k = 3 mins 23 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 39 to 41)
(PDF)
- Size: 1.07 MB
- Estimated download time: (56k = 2 mins 41 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 42 & 43)
(PDF)
- Size: 621.53 KB
- Estimated download time: (56k = 1 mins 32 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 44 to 49)
(PDF)
- Size: 1.92 MB
- Estimated download time: (56k = 4 mins 48 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 50 to 53)
(PDF)
- Size: 1.09 MB
- Estimated download time: (56k = 2 mins 44 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 54 to 58)
(PDF)
- Size: 1.8 MB
- Estimated download time: (56k = 4 mins 32 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 59 to 65)
(PDF)
- Size: 2.24 MB
- Estimated download time: (56k = 5 mins 36 secs)
Issues and Options: Site Allocations & Policies Appendix A (sites 66 to 70)
(PDF)
- Size: 1.61 MB
- Estimated download time: (56k = 4 mins 2 secs)
Issues and Options: List of Issues Considered
(PDF)
- Size: 7.51 KB
- Estimated download time: (56k = 2 secs)
LDF: Issues and Options Consultation Supporting Documents
Housing Delivery in Ipswich
(PDF)
- Size: 27.43 KB
- Estimated download time: (56k = 5 secs)
Housing Density in Ipswich
(PDF)
- Size: 33.93 KB
- Estimated download time: (56k = 5 secs)
Windfall Housing Rates in Ipswich
(PDF)
- Size: 24.47 KB
- Estimated download time: (56k = 4 secs)
LDF: Preferred Options - Consultation Comments Summary
Summary tables of the consultation comments received at Preferred Options stage of the LDF.
LDF Preferred Options - Consultation Comments Summary
(PDF)
- Size: 565.29 KB
- Estimated download time: (56k = 1 mins 23 secs)
LDF: Preferred Options - Executive 09.09.08
Feedback from the Preferred Options consultation to the Executive.
Preferred Options - Executive Committee Report 09.09.08
(PDF)
- Size: 137.97 KB
- Estimated download time: (56k = 21 secs)
LDF: Preferred Options Papers - Executive 19.11.07
Preferred Options Executive Committee Report 19.11.07
(PDF)
- Size: 74.72 KB
- Estimated download time: (56k = 11 secs)
Appendix 1 - A Summary of the Tests of Soundness
(PDF)
- Size: 11.93 KB
- Estimated download time: (56k = 2 secs)
Appendix 2 - Summary of Issues and Options Consultation Methods
(PDF)
- Size: 11.96 KB
- Estimated download time: (56k = 2 secs)
Appendix 3 - Analysis of Issues and Options Comments (Core Strategies and Policies Document)
(PDF)
- Size: 72.39 KB
- Estimated download time: (56k = 11 secs)
- Size: 57.14 KB
- Estimated download time: (56k = 9 secs)
Appendix 5 - Analysis of Issues and Options Comments (Site Allocations and Policies Document)
(PDF)
- Size: 59.44 KB
- Estimated download time: (56k = 9 secs)
Appendix 6 - Analysis of Issues and Options Comments (IP-One Area Action Plan)
(PDF)
- Size: 69.35 KB
- Estimated download time: (56k = 11 secs)
- Size: 33.76 KB
- Estimated download time: (56k = 5 secs)
- Size: 383.12 KB
- Estimated download time: (56k = 57 secs)
- Size: 90.52 KB
- Estimated download time: (56k = 14 secs)
Appendix 9 - Site Allocations and Policies - Part D - Appendix 3
(PDF)
- Size: 2.59 MB
- Estimated download time: (56k = 6 mins 29 secs)
- Size: 301.46 KB
- Estimated download time: (56k = 45 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area A - Island Site
(PDF)
- Size: 2.03 MB
- Estimated download time: (56k = 5 mins 5 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area B - Merchant Quarter
(PDF)
- Size: 3.39 MB
- Estimated download time: (56k = 8 mins 29 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area C - Holywells
(PDF)
- Size: 1.73 MB
- Estimated download time: (56k = 4 mins 20 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area D - Education Quarter
(PDF)
- Size: 2.08 MB
- Estimated download time: (56k = 5 mins 12 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area E - Over Stoke Waterside
(PDF)
- Size: 2.05 MB
- Estimated download time: (56k = 5 mins 8 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area F - Riverside West
(PDF)
- Size: 2.28 MB
- Estimated download time: (56k = 5 mins 44 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area G - River Corridor
(PDF)
- Size: 2.58 MB
- Estimated download time: (56k = 6 mins 29 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area H - Ipswich Village West
(PDF)
- Size: 2.21 MB
- Estimated download time: (56k = 5 mins 32 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area I - Portman Road
(PDF)
- Size: 2.01 MB
- Estimated download time: (56k = 5 mins 2 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area J - Westgate
(PDF)
- Size: 2.34 MB
- Estimated download time: (56k = 5 mins 51 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area K - Mint Quarter
(PDF)
- Size: 2.38 MB
- Estimated download time: (56k = 5 mins 57 secs)
Appendix 10 - IP-One Area Action Plan - Part C - Opportunity Area L - Crown Street
(PDF)
- Size: 2.18 MB
- Estimated download time: (56k = 5 mins 29 secs)
Appendix 10 - IP-One Area Action Plan - Part D - Delivery
(PDF)
- Size: 15.99 KB
- Estimated download time: (56k = 3 secs)
Appendix 10 - IP-One Area Action Plan - Appendix A
(PDF)
- Size: 4.15 MB
- Estimated download time: (56k = 10 mins 23 secs)
- Size: 27.21 KB
- Estimated download time: (56k = 4 secs)
Appendix 12 - Ipswich Local Development Framework Update
(PDF)
- Size: 1016.75 KB
- Estimated download time: (56k = 2 mins 29 secs)
Appendix 13 - Draft Strategic Flood Risk Assessment (November 2007)
(PDF)
- Size: 33.98 KB
- Estimated download time: (56k = 5 secs)
Appendix 14 - List of Preferred Options Consultation Stakeholders
(PDF)
- Size: 20.9 KB
- Estimated download time: (56k = 4 secs)
Appendix 15 - Equality and Diversity Assessment Summary
(PDF)
- Size: 36.75 KB
- Estimated download time: (56k = 6 secs)
Executive Report Preferred Options - 19 November 2007 - Appendix 9 Update 1
(PDF)
- Size: 107.63 KB
- Estimated download time: (56k = 16 secs)
Appendix 9 - Additional Site Profiles - 16 November 2007
(PDF)
- Size: 5.5 MB
- Estimated download time: (56k = 13 mins 44 secs)
Appendix 10 - Appendix A - Additional Site Profiles
(PDF)
- Size: 2.78 MB
- Estimated download time: (56k = 6 mins 57 secs)
Legal Compliance and Soundness self assessment toolkit
A Legal Compliance and Soundness self assessment toolkit, including appendices and relevant committee reports, was submitted to the Secretary of State on 26th March 2010 alongside the Core Documents.
Legal Compliance and Soundness self assessment toolkit
(PDF)
- Size: 248.77 KB
- Estimated download time: (56k = 37 secs)
Legal Compliance and Soundness self assessment toolkit - appendices
(PDF)
- Size: 2.28 MB
- Estimated download time: (56k = 5 mins 41 secs)
Committee Report - Nov 2004 (Local Development Scheme)
(PDF)
- Size: 381.07 KB
- Estimated download time: (56k = 56 secs)
Committee Report - April 2005 (Statement of Community Involvement)
(PDF)
- Size: 203.38 KB
- Estimated download time: (56k = 30 secs)
Committee Report - Feb 2006 (Sustainability Appraisal Scoping Report)
(PDF)
- Size: 278.6 KB
- Estimated download time: (56k = 41 secs)
Committee Report - March 2006 (Draft Statement of Community Involvement)
(PDF)
- Size: 898.73 KB
- Estimated download time: (56k = 2 mins 12 secs)
Committee Report - June 2006 (Local Development Framework)
(PDF)
- Size: 430.22 KB
- Estimated download time: (56k = 1 mins 3 secs)
Committee Report - Aug 2006 (Regional Planning and LDF Issues)
(PDF)
- Size: 549.67 KB
- Estimated download time: (56k = 1 mins 21 secs)
Committee Report - Nov 2007 (Preferred Options)
(PDF)
- Size: 560.74 KB
- Estimated download time: (56k = 1 mins 23 secs)
Leisure Procurement Options Appraisal
Core Document Library ref: PCD91
Leisure Procurement Options Appraisal
(PDF)
- Size: 192.75 KB
- Estimated download time: (56k = 29 secs)
Local Development Scheme
Formal notice from Secretary of State - 20th April 2009
(PDF)
- Size: 36.24 KB
- Estimated download time: (56k = 6 secs)
Local Development Scheme 2009
(PDF)
- Size: 630.18 KB
- Estimated download time: (56k = 1 mins 33 secs)
Local Development Scheme 2007
(PDF)
- Size: 399.69 KB
- Estimated download time: (56k = 59 secs)
Local Development Scheme 2006
(PDF)
- Size: 327.13 KB
- Estimated download time: (56k = 48 secs)
Local Development Scheme 2005
(PDF)
- Size: 2.93 MB
- Estimated download time: (56k = 7 mins 20 secs)
Executive Report - draft revised Local Development Scheme - 8th March 2011
(PDF)
- Size: 174.26 KB
- Estimated download time: (56k = 26 secs)
Local Development Scheme 2011
(PDF)
- Size: 2.22 MB
- Estimated download time: (56k = 5 mins 33 secs)
Local Development Scheme Informal Update March 2012 - revised timetable
(PDF)
- Size: 69.18 KB
- Estimated download time: (56k = 11 secs)
Full Local Development Scheme document - July 2012
(PDF)
- Size: 682.89 KB
- Estimated download time: (56k = 1 mins 41 secs)
Local Development Scheme work schedule chart - July 2012
(PDF)
- Size: 11.21 KB
- Estimated download time: (56k = 2 secs)
Local Development Scheme Informal Update work schedule chart January 2013
(PDF)
- Size: 67.5 KB
- Estimated download time: (56k = 10 secs)
Local Investment Plan update
Quarterly reviews of the Ipswich Local Investment Plan.
LIP update - April 2011
(PDF)
- Size: 55.08 KB
- Estimated download time: (56k = 9 secs)
Matter 11 - Development Control Changes
Core Document Library ref: ECD11
Matter 11 - Development Control Changes
(PDF)
- Size: 191.73 KB
- Estimated download time: (56k = 29 secs)
Matter 4 - Affordable Housing Suggested Changes
Core Document Library ref: ECD08
Matter 4 - Affordable Housing Suggested Changes
(PDF)
- Size: 183.93 KB
- Estimated download time: (56k = 27 secs)
Matter 6 - Sustainable Development Suggested Change
Core Document Library ref: ECD09
Matter 6 - Sustainable Development Suggested Change
(PDF)
- Size: 176.24 KB
- Estimated download time: (56k = 26 secs)
Matter 8 - Retail Suggested Change
Core Document Library ref: ECD10
Matter 8 - Retail Suggested Change
(PDF)
- Size: 167.46 KB
- Estimated download time: (56k = 25 secs)
Mersea Homes Ltd Appeal Decision
Mersea Homes Ltd Appeal Decision
(PDF)
- Size: 1.07 MB
- Estimated download time: (56k = 2 mins 41 secs)
Opening Statement on behalf of Ipswich Borough Council
Opening Statement on behalf of Ipswich Borough Council
(PDF)
- Size: 1.71 MB
- Estimated download time: (56k = 4 mins 17 secs)
Part A - Planning for Growth Statements
Planning for Growth Statement - Ipswich Borough Council
(PDF)
- Size: 378.1 KB
- Estimated download time: (56k = 56 secs)
Planning for Growth Statement - Save Our Country Spaces
(PDF)
- Size: 236.84 KB
- Estimated download time: (56k = 35 secs)
Planning for Growth Statement - Mersea Homes
(PDF)
- Size: 38.6 KB
- Estimated download time: (56k = 6 secs)
Planning for Growth Statement - The Theatres Trust
(PDF)
- Size: 73.8 KB
- Estimated download time: (56k = 11 secs)
Planning for Growth Statement - Foster Davies LLP
(PDF)
- Size: 58.11 KB
- Estimated download time: (56k = 9 secs)
PCD01 - A Green Infrastructure Strategy for the Haven Gateway - Appendices
PCD01 - A Green Infrastructure Strategy for the Haven Gateway - Appendices
(PDF)
- Size: 6.4 MB
- Estimated download time: (56k = 16 mins 0 secs)
PCD02 - Planning Policy Statement 25: Development and Flood Risk
PCD02 - Planning Policy Statement 25: Development and Flood Risk
(PDF)
- Size: 580.12 KB
- Estimated download time: (56k = 1 mins 26 secs)
PCD03 - The Town and Country Planning (Local Development) (England) (Amendment) Regulations 2009
PCD03 - The Town and Country Planning (Local Development) (England) (Amendment) Regulations 2009
(PDF)
- Size: 49.45 KB
- Estimated download time: (56k = 8 secs)
PCD04 - Housing Land Availability 2009
PCD04 - Housing Land Availability 2009
(PDF)
- Size: 480.87 KB
- Estimated download time: (56k = 1 mins 11 secs)
PCD05 - Ipswich Borough Ward Profiling Project
PCD05 - Ipswich Borough Ward Profiling Project
(PDF)
- Size: 1.97 MB
- Estimated download time: (56k = 4 mins 56 secs)
PCD06 - Preliminary NATA Study of Options for Access to Ipswich Port Area
PCD06 - Main Report
(PDF)
- Size: 7.2 MB
- Estimated download time: (56k = 18 mins 0 secs)
Figure 1
(PDF)
- Size: 9.53 MB
- Estimated download time: (56k = 23 mins 48 secs)
Figure 2
(PDF)
- Size: 9.9 MB
- Estimated download time: (56k = 24 mins 44 secs)
Figure 3
(PDF)
- Size: 13.33 MB
- Estimated download time: (56k = 33 mins 17 secs)
Figure 4
(PDF)
- Size: 10.52 MB
- Estimated download time: (56k = 26 mins 17 secs)
Photograph 1
(PDF)
- Size: 9.67 MB
- Estimated download time: (56k = 24 mins 9 secs)
Photograph 2
(PDF)
- Size: 10.96 MB
- Estimated download time: (56k = 27 mins 23 secs)
Photograph 3
(PDF)
- Size: 11.49 MB
- Estimated download time: (56k = 28 mins 42 secs)
Photograph 4
(PDF)
- Size: 8.77 MB
- Estimated download time: (56k = 21 mins 56 secs)
Photograph 5
(PDF)
- Size: 8.52 MB
- Estimated download time: (56k = 21 mins 17 secs)
Photograph 6
(PDF)
- Size: 8.69 MB
- Estimated download time: (56k = 21 mins 44 secs)
PCD19 - Ipswich Local Investment Plan
PCD19 - Ipswich Local Investment Plan
(PDF)
- Size: 1.48 MB
- Estimated download time: (56k = 3 mins 42 secs)
PCD20 - Chelmer Model
PCD20 - Chelmer Model
(PDF)
- Size: 1.19 MB
- Estimated download time: (56k = 2 mins 59 secs)
PCD21 - Letter to Ipswich Borough Council
PCD21 - Letter to Ipswich Borough Council
(PDF)
- Size: 125.21 KB
- Estimated download time: (56k = 19 secs)
PCD22 - Housing Land Availability Report
PCD22 - Housing Land Availability Report
(PDF)
- Size: 550.04 KB
- Estimated download time: (56k = 1 mins 21 secs)
PCD23 - Annual Monitoring Report 2009/10
PCD23 - Annual Monitoring Report 2009/10
(PDF)
- Size: 924.55 KB
- Estimated download time: (56k = 2 mins 17 secs)
PCD24 - Letter and Appendix 1 from Suffolk County Council to EERA
PCD24 - Letter and Appendix 1 from Suffolk County Council to EERA
(PDF)
- Size: 40.82 KB
- Estimated download time: (56k = 6 secs)
PCD25 - Letter to Chief Planning Officer from Department for Communities and Local Government
PCD25 - Letter to Chief Planning Officer from Department for Communities and Local Government
(PDF)
- Size: 138.88 KB
- Estimated download time: (56k = 21 secs)
PCD26 - Local Growth paper: realising every place's potential
PCD26 - Local Growth paper: realising every place's potential
(PDF)
- Size: 1.45 MB
- Estimated download time: (56k = 3 mins 38 secs)
PCD27 - Suffolk County Structure Plan
PCD27 - Suffolk County Structure Plan
(PDF)
- Size: 1019.83 KB
- Estimated download time: (56k = 2 mins 30 secs)
PCD29 - Table 577 Housing Market: ratio of median house price to median earnings
PCD29 - Table 577 Housing Market: ratio of median house price to median earnings
(PDF)
- Size: 113.74 KB
- Estimated download time: (56k = 17 secs)
PCD30 - Draft Housing Strategy 2010 - 2015
PCD30 - Draft Housing Strategy 2010 - 2015
(PDF)
- Size: 328.6 KB
- Estimated download time: (56k = 49 secs)
PCD31 - The Coalition Government's Housing Initiatives
PCD31 - The Coalition Government's Housing Initiatives
(PDF)
- Size: 286.64 KB
- Estimated download time: (56k = 42 secs)
PCD32 Ipswich Renewable Energy and Sustainable Construction Viability Resource Assessment - final report
- Size: 1.02 MB
- Estimated download time: (56k = 2 mins 35 secs)
PCD33 The Code for Sustainable Homes - case studies volume 2
PCD33 The Code for Sustainable Homes - case studies volume 2
(PDF)
- Size: 1.61 MB
- Estimated download time: (56k = 4 mins 2 secs)
PCD34 Supporting paper on Housing Density in Ipswich
PCD34 Supporting paper on Housing Density in Ipswich
(PDF)
- Size: 33.93 KB
- Estimated download time: (56k = 5 secs)
PCD35 Letter to Chief Planning Officers
PCD35 Letter to Chief Planning Officers "Abolition of Regional Strategies"
(PDF)
- Size: 61.65 KB
- Estimated download time: (56k = 10 secs)
PCD37 Reviewed Core Strategy & Development Management Policies - consultation draft
PCD37 Reviewed Core Strategy & Development Management Policies - consultation draft
(PDF)
- Size: 2.97 MB
- Estimated download time: (56k = 7 mins 26 secs)
PCD38 East of England Forecasting Model
PCD38 East of England Forecasting Model
(PDF)
- Size: 204.21 KB
- Estimated download time: (56k = 30 secs)
PCD40 Proposed Focused Changes Topic Papers
PCD40 Proposed Focused Changes Topic Papers
(PDF)
- Size: 1.24 MB
- Estimated download time: (56k = 3 mins 6 secs)
PCD41 Proposed Focused Changes, Summary of Main Issues
PCD41 Proposed Focused Changes, Summary of Main Issues
(PDF)
- Size: 224.46 KB
- Estimated download time: (56k = 33 secs)
PCD43 Urban Design Compendium
PCD43 Urban Design Compendium
(PDF)
- Size: 6.14 MB
- Estimated download time: (56k = 15 mins 21 secs)
PCD44 Sustainable Settlements
PCD44 Sustainable Settlements
(PDF)
- Size: 13.02 MB
- Estimated download time: (56k = 32 mins 32 secs)
PCD47 Greenways 2009/2010 Annual Report
PCD47 Greenways 2009/2010 Annual Report
(PDF)
- Size: 435.9 KB
- Estimated download time: (56k = 1 mins 5 secs)
PCD48 Planning Policy Guidance 16: Archaeology & Planning
PCD48 Planning Policy Guidance 16: Archaeology & Planning
(PDF)
- Size: 252.3 KB
- Estimated download time: (56k = 37 secs)
PCD50 Public Art & the Planning System
PCD50 Public Art & the Planning System
(PDF)
- Size: 70.52 KB
- Estimated download time: (56k = 11 secs)
PCD51 Core Output Indicators - Update 2/2008
PCD51 Core Output Indicators - Update 2/2008
(PDF)
- Size: 155.65 KB
- Estimated download time: (56k = 23 secs)
PCD52 Executive Committee Report E/10/23 - Public Art
PCD52 Executive Committee Report E/10/23 - Public Art
(PDF)
- Size: 88.65 KB
- Estimated download time: (56k = 13 secs)
PCD53 Local Air Quality Management
PCD53 Local Air Quality Management
(PDF)
- Size: 2.51 MB
- Estimated download time: (56k = 6 mins 17 secs)
PCD54 Planning Policy Guidance 13: Transport
PCD54 Planning Policy Guidance 13: Transport
(PDF)
- Size: 198.5 KB
- Estimated download time: (56k = 30 secs)
PCD55 Letter to Chief Planning Officers re parking policy and electric vehicle infrastructure
PCD55 Letter to Chief Planning Officers re parking policy and electric vehicle infrastructure
(PDF)
- Size: 89.9 KB
- Estimated download time: (56k = 14 secs)
PCD56 Ipswich Local Plan SPG - Public Open Space
PCD56 Ipswich Local Plan SPG - Public Open Space
(PDF)
- Size: 184.59 KB
- Estimated download time: (56k = 28 secs)
PCD58 Core Strategy - the Future Growth of Babergh District to 2031
PCD58 Core Strategy - the Future Growth of Babergh District to 2031
(PDF)
- Size: 412.75 KB
- Estimated download time: (56k = 1 mins 2 secs)
PCD59 Adopted Core Strategy Development Plan Document, adopted September 2008
PCD59 Adopted Core Strategy Development Plan Document, adopted September 2008
(PDF)
- Size: 7.53 MB
- Estimated download time: (56k = 18 mins 48 secs)
PCD66 Report on the Examination into the Colchester Core Strategy Development Plan Document
PCD66 Report on the Examination into the Colchester Core Strategy Development Plan Document
(PDF)
- Size: 149.66 KB
- Estimated download time: (56k = 22 secs)
Planning Policy Guidance 15: Planning and the Historic Environment (PPG15)
Planning Policy Guidance 15: Planning and the Historic Environment (PPG15)
(PDF)
- Size: 266.09 KB
- Estimated download time: (56k = 39 secs)
Planning Policy Guidance 16: Archaeology and Planning (PPG16)
Planning Policy Guidance 16: Archaeology and Planning (PPG16)
(PDF)
- Size: 252.3 KB
- Estimated download time: (56k = 37 secs)
Planning Policy Guidance 4:Industrial, commercial development and small firms (PPG4)
Planning Policy Guidance 4:Industrial, commercial development and small firms (PPG4)
(PDF)
- Size: 57.62 KB
- Estimated download time: (56k = 9 secs)
Planning Policy Guidance 8:Telecommunications(PPG8)
Planning Policy Guidance 8:Telecommunications(PPG8)
(PDF)
- Size: 315 KB
- Estimated download time: (56k = 47 secs)
Planning Policy Statement 10: Planning for Sustainable Waste Management (PPS10)
Planning Policy Statement 10: Planning for Sustainable Waste Management (PPS10)
(PDF)
- Size: 3.61 MB
- Estimated download time: (56k = 9 mins 2 secs)
Planning Policy Statement 12:Local Development Frameworks (PPS 12)
Planning Policy Statement 12:Local Development Frameworks (PPS 12)
(PDF)
- Size: 1.37 MB
- Estimated download time: (56k = 3 mins 26 secs)
Planning Policy Statement 3 - Housing
Planning Policy Statement 3 - Housing
(PDF)
- Size: 319.3 KB
- Estimated download time: (56k = 47 secs)
Planning Policy Statement 5: Planning for the 2010 Historic Environment (PPS5)
Planning Policy Statement 5: Planning for the 2010 Historic Environment (PPS5)
(PDF)
- Size: 322.29 KB
- Estimated download time: (56k = 48 secs)
Planning Regulations 2004
Planning Regulations 2004
(PDF)
- Size: 118.38 KB
- Estimated download time: (56k = 18 secs)
Pre-hearing Meeting 15.06.10 Guidance Note
Examination into the Core Strategy Development Plan Document - A Guidance Note from the Inspector.
Pre-hearing Meeting 15.06.10 - Guidance Note
(PDF)
- Size: 127.57 KB
- Estimated download time: (56k = 19 secs)
Pre-Submission Consultation Statement
This document explains how people have been involved in the preparation of the Proposed Submission Core Strategy and Policies document.
Main report
(PDF)
- Size: 969.18 KB
- Estimated download time: (56k = 2 mins 23 secs)
Appendix 1
(PDF)
- Size: 329.04 KB
- Estimated download time: (56k = 49 secs)
Appendix 2
(PDF)
- Size: 10.38 MB
- Estimated download time: (56k = 25 mins 56 secs)
Appendices 3, 4 & 5
(PDF)
- Size: 11.08 MB
- Estimated download time: (56k = 27 mins 41 secs)
Appendix 6
(PDF)
- Size: 1.25 MB
- Estimated download time: (56k = 3 mins 8 secs)
Appendix 7
(PDF)
- Size: 9.05 MB
- Estimated download time: (56k = 22 mins 35 secs)
Appendix 8
(PDF)
- Size: 2.37 MB
- Estimated download time: (56k = 5 mins 56 secs)
Appendix 9 & 10
(PDF)
- Size: 1.9 MB
- Estimated download time: (56k = 4 mins 44 secs)
Proposed Focused Changes Topic Paper - Cross Boundary Working
Proposed Focused Changes Topic Paper - Cross Boundary Working
(PDF)
- Size: 131.13 KB
- Estimated download time: (56k = 20 secs)
Proposed Focused Changes Topic Paper - Gypsy & Traveller Accommodation
Proposed Focused Changes Topic Paper - Gypsy & Traveller Accommodation
(PDF)
- Size: 680.68 KB
- Estimated download time: (56k = 1 mins 41 secs)
Proposed Focused Changes Topic Paper - Jobs
Proposed Focused Changes Topic Paper - Jobs
(PDF)
- Size: 153.79 KB
- Estimated download time: (56k = 23 secs)
Proposed Focused Changes Topic Paper - Reviewing the Density of Residential Development
Proposed Focused Changes Topic Paper - Reviewing the Density of Residential Development
(PDF)
- Size: 167.91 KB
- Estimated download time: (56k = 25 secs)
Proposed Focused Changes Topic Paper - Reviewing the Ipswich Northern Fringe
Proposed Focused Changes Topic Paper - Reviewing the Ipswich Northern Fringe
(PDF)
- Size: 120.09 KB
- Estimated download time: (56k = 18 secs)
Proposed Submission Core Strategy and Policies consultation supporting information
Schedule of public events
(PDF)
- Size: 99.7 KB
- Estimated download time: (56k = 15 secs)
Statement of Representations Procedure
(PDF)
- Size: 18.76 KB
- Estimated download time: (56k = 3 secs)
Representation Guidance Note
(PDF)
- Size: 35.67 KB
- Estimated download time: (56k = 6 secs)
Representation Form
(PDF)
- Size: 14.87 KB
- Estimated download time: (56k = 3 secs)
A Guide to the Proposed Submission Core Strategy and Policies
(PDF)
- Size: 127.4 KB
- Estimated download time: (56k = 19 secs)
Proposed Submission Core Strategy and Policies Supporting Documents Comment Form
(PDF)
- Size: 111.51 KB
- Estimated download time: (56k = 17 secs)
Proposed wording change to cumulative Proposed Changes
Proposed wording change to cumulative Proposed Changes
(PDF)
- Size: 169.12 KB
- Estimated download time: (56k = 25 secs)
Reg 30 (1) (e) Appendices
Reg 30 (1) (e) Appendices
(PDF)
- Size: 6.36 MB
- Estimated download time: (56k = 15 mins 53 secs)
Regional Spatial Strategy Single Issue Review: Planning for Gypsy and Traveller Accommodation in the East of England
Core Strategy Library ref: PCD94
- Size: 605.2 KB
- Estimated download time: (56k = 1 mins 29 secs)
Regulation 30 (1) (e) Core Strategy and Policies Statement of Representations
Regulation 30 (1) (e) Core Strategy and Policies Statement of Representations
(PDF)
- Size: 14.45 MB
- Estimated download time: (56k = 36 mins 6 secs)
SCD01 Ipswich Hospital NHS Trust - Estate Strategy
SCD01 Ipswich Hospital NHS Trust - Estate Strategy
(PDF)
- Size: 13.7 MB
- Estimated download time: (56k = 34 mins 14 secs)
SCD03 Suffolk Structure Plan Saved Policies
SCD 03 Suffolk Structure Plan Saved Policies
(PDF)
- Size: 79.67 KB
- Estimated download time: (56k = 12 secs)
SCD18 Haven Gateway Employment Land Study December 2005
SCD 18 Haven Gateway Employment Land Study December 2005
(PDF)
- Size: 1.74 MB
- Estimated download time: (56k = 4 mins 21 secs)
Schedule of Proposed Amendments
Schedule of Proposed Amendments
(PDF)
- Size: 112.89 KB
- Estimated download time: (56k = 17 secs)
SDC19 Haven Gateway Ipswich A14 Study
SDC 19 Haven Gateway Ipswich A14 Study
(PDF)
- Size: 4.8 MB
- Estimated download time: (56k = 12 mins 0 secs)
Site Allocations & Policies Preferred Options Proposals Map
Site Allocations & Policies Preferred Options Proposals Map
(PDF)
- Size: 5.38 MB
- Estimated download time: (56k = 13 mins 27 secs)
SOCS' response to Proposed Focused Changes to CS10
Core Document Library ref: ECD13
SOCS' response to Proposed Focused Changes to CS10
(PDF)
- Size: 44.71 KB
- Estimated download time: (56k = 7 secs)
Statement of Community Involvement
Statement of Community Involvement adopted 11th September 2007
(PDF)
- Size: 1.02 MB
- Estimated download time: (56k = 2 mins 33 secs)
SCI - Notice of Adoption
(PDF)
- Size: 19.09 KB
- Estimated download time: (56k = 3 secs)
SCI - Inspector's Report
(PDF)
- Size: 389.07 KB
- Estimated download time: (56k = 57 secs)
Statement of Consultation on Proposed Focused Changes to the Core Strategy and Policies DPD
Statement of Consultation on Proposed Focused Changes to the Core Strategy and Policies DPD
(PDF)
- Size: 1.94 MB
- Estimated download time: (56k = 4 mins 51 secs)
Strategic Flood Risk Assessment Level 2 - report and appendices
Core Document Library ref: PCD93
Strategic Flood Risk Assessment Level 2 - main report
(PDF)
- Size: 12.89 MB
- Estimated download time: (56k = 32 mins 12 secs)
SFRA Appendix 1 - Guidance for Site Allocations
(PDF)
- Size: 80.24 KB
- Estimated download time: (56k = 12 secs)
SFRA Appendix 2 - Speed of Onset and Duration Graphs (all compartments)
(PDF)
- Size: 45.62 KB
- Estimated download time: (56k = 7 secs)
SFRA Appendix 3 - Anglian Water Comments
(PDF)
- Size: 931.34 KB
- Estimated download time: (56k = 2 mins 17 secs)
SFRA Appendix 4 - Guidance on producing Flood Plans for New Buildings
(PDF)
- Size: 108.81 KB
- Estimated download time: (56k = 16 secs)
SFRA Appendix 5.1 - Ipswich Boundary and Major Watercourses
(PDF)
- Size: 1.74 MB
- Estimated download time: (56k = 4 mins 21 secs)
SFRA Appendix 5.2 - Tidal Defence (Structures)
(PDF)
- Size: 556.08 KB
- Estimated download time: (56k = 1 mins 23 secs)
SFRA Appendix 5.3 - Tidal Defence (Crest Levels)
(PDF)
- Size: 1.2 MB
- Estimated download time: (56k = 3 mins 0 secs)
SFRA Appendix 5.4 - Tidal Defence (Expected Failure Dates)
(PDF)
- Size: 862.53 KB
- Estimated download time: (56k = 2 mins 8 secs)
SFRA Appendix 5.5 - Local Flooding, Watercourses, ASTSWF & Groundwater Flood
(PDF)
- Size: 9.75 MB
- Estimated download time: (56k = 24 mins 20 secs)
SFRA Appendix 5.6 - Geology, General Topography & Minor watercourses (Elect)
(PDF)
- Size: 1.54 MB
- Estimated download time: (56k = 3 mins 51 secs)
SFRA Appendix 5.7 - Trunk Sewers
(PDF)
- Size: 913.72 KB
- Estimated download time: (56k = 2 mins 14 secs)
SFRA Appendix 5.8 - Highway and Railway Drains
(PDF)
- Size: 1.24 MB
- Estimated download time: (56k = 3 mins 6 secs)
SFRA Appendix 5.9 - 1953 Tidal Flood
(PDF)
- Size: 1.2 MB
- Estimated download time: (56k = 3 mins 0 secs)
SFRA Appendix 5.10 - 1939 Fluvial Flood
(PDF)
- Size: 631.64 KB
- Estimated download time: (56k = 1 mins 33 secs)
SFRA Appendix 5.11 - 1947 Fluvial Flood
(PDF)
- Size: 493.05 KB
- Estimated download time: (56k = 1 mins 14 secs)
SFRA Appendix 5.12 - LiDAR Data Survey Dates Sheet 1
(PDF)
- Size: 871.44 KB
- Estimated download time: (56k = 2 mins 8 secs)
SFRA Appendix 5.12 - LiDAR Data Survey Dates Sheet 2
(PDF)
- Size: 870.79 KB
- Estimated download time: (56k = 2 mins 8 secs)
SFRA Appendix 5.13 - SFRA Ground Level Contours from LIDAR
(PDF)
- Size: 1.15 MB
- Estimated download time: (56k = 2 mins 53 secs)
SFRA Appendix 5.14 - Flood Compartments
(PDF)
- Size: 941.45 KB
- Estimated download time: (56k = 2 mins 18 secs)
SFRA Appendix 5.15 - Variation in Tidal Flood Frequency - Existing @ 2010
(PDF)
- Size: 1.21 MB
- Estimated download time: (56k = 3 mins 2 secs)
SFRA Appendix 5.16 - Variation in Tidal Flood Frequency - Existing @ 2110
(PDF)
- Size: 1.23 MB
- Estimated download time: (56k = 3 mins 5 secs)
SFRA Appendix 5.17 - Variation in Tidal Flood Frequency - Proposed @ 2015
(PDF)
- Size: 1.19 MB
- Estimated download time: (56k = 2 mins 59 secs)
SFRA Appendix 5.18 - Variation in Tidal Flood Frequency - Proposed @ 2110
(PDF)
- Size: 1.2 MB
- Estimated download time: (56k = 3 mins 0 secs)
SFRA Appendix 5.20 - Hazard Mapping Existing Defences Fully Operational at 0.5% AEP in 2010
(PDF)
- Size: 1.3 MB
- Estimated download time: (56k = 3 mins 15 secs)
SFRA Appendix 5.21 - Hazard Mapping Existing Defences Fully Operational at 0.5% AEP in 2110
(PDF)
- Size: 2.13 MB
- Estimated download time: (56k = 5 mins 20 secs)
SFRA Appendix 5.22 - Hazard Mapping Existing Defences Fully Operational at 0.1% AEP in 2010
(PDF)
- Size: 1.84 MB
- Estimated download time: (56k = 4 mins 36 secs)
SFRA Appendix 5.23 - Hazard Mapping Existing Defences Fully Operational at 0.1% AEP in 2110
(PDF)
- Size: 2.15 MB
- Estimated download time: (56k = 5 mins 23 secs)
SFRA Appendix 5.24 - Hazard Mapping Proposed Defences Fully Operational at 0.5% AEP in 2110
(PDF)
- Size: 1.43 MB
- Estimated download time: (56k = 3 mins 35 secs)
SFRA Appendix 5.25 - Hazard Mapping Proposed Defences Fully Operational at 0.1% AEP in 2015
(PDF)
- Size: 1.45 MB
- Estimated download time: (56k = 3 mins 38 secs)
SFRA Appendix 5.26 - Hazard Mapping Proposed Defences Fully Operational at 0.1% AEP in 2110
(PDF)
- Size: 1.46 MB
- Estimated download time: (56k = 3 mins 41 secs)
SFRA Appendix 5.27 - SFRA Existing Vulnerable Development & Tidal Flood Hazard at 0.1% AEP in 2010
(PDF)
- Size: 4.29 MB
- Estimated download time: (56k = 10 mins 44 secs)
SFRA Appendix 5.28 - SFRA EA Zone3 & Brown Field SHLAA Sites
(PDF)
- Size: 1.79 MB
- Estimated download time: (56k = 4 mins 29 secs)
SFRA Appendix 5.29 - Areas where Infiltration type SUDS are likely to be possible
(PDF)
- Size: 1.4 MB
- Estimated download time: (56k = 3 mins 30 secs)
SFRA Appendix 5.30 - Flood Storage Facilities Existing & Future Needs
(PDF)
- Size: 1.63 MB
- Estimated download time: (56k = 4 mins 5 secs)
SFRA Appendix 5.31 - Flood Depth Plans 0.1% AEP 2110
(PDF)
- Size: 6.93 MB
- Estimated download time: (56k = 17 mins 18 secs)
SFRA Appendix 5.32 - Floodwater Velocity Plans 0.1% AEP 2110
(PDF)
- Size: 5.17 MB
- Estimated download time: (56k = 12 mins 56 secs)
SFRA Appendix 5.34 - Combined Hazard Ratings Flood Level 5.28mAOD without Barrier
(PDF)
- Size: 8.93 MB
- Estimated download time: (56k = 22 mins 20 secs)
SFRA Appendix 5.35 - Combined Hazard Ratings Flood Level 5.28mAOD with Barrier
(PDF)
- Size: 1.89 MB
- Estimated download time: (56k = 4 mins 44 secs)
SFRA Appendix 5.36 - EA Flood Zone 3 & 0.5% AEP @2110
(PDF)
- Size: 3.61 MB
- Estimated download time: (56k = 9 mins 2 secs)
SFRA Appendix 5.37 -
(PDF)
- Size: 155.21 KB
- Estimated download time: (56k = 23 secs)
Suffolk Haven Gateway Employment Land Review and Strategic Sites Study
Suffolk Haven Gateway Employment Land Review was commissioned by the Haven Gateway Partnership as part of the evidence base for the emerging Local Development Framework.
Suffolk Haven Gateway Employment Land Review - Main Report
(PDF)
- Size: 10.41 MB
- Estimated download time: (56k = 26 mins 0 secs)
Suffolk Haven Gateway Employment Land Review - Appendix 1
(PDF)
- Size: 176.48 KB
- Estimated download time: (56k = 26 secs)
Suffolk Haven Gateway Employment Land Review - Appendix 2
(PDF)
- Size: 327.82 KB
- Estimated download time: (56k = 48 secs)
Suffolk Haven Gateway Employment Land Review - Appendix 3
(PDF)
- Size: 276.05 KB
- Estimated download time: (56k = 41 secs)
Suffolk Haven Gateway Employment Land Review& Strategic Sites Study
Suffolk Haven Gateway Employment Land Review& Strategic Sites Study
(PDF)
- Size: 11.17 MB
- Estimated download time: (56k = 27 mins 54 secs)
Suffolk Structure Plan 2001: Saved Policies
Suffolk Structure Plan 2001: Saved Policies
(PDF)
- Size: 79.67 KB
- Estimated download time: (56k = 12 secs)
Suffolk Trends 2009 Background Paper Population April 2010
PCD19 - Suffolk Trends 2009 Background Paper Population April 2010
(PDF)
- Size: 2.03 MB
- Estimated download time: (56k = 5 mins 5 secs)
Suffolk's Local Economic Assessment Draft
Suffolk's Local Economic Assessment Draft
(PDF)
- Size: 367.54 KB
- Estimated download time: (56k = 54 secs)
Summary of Preferred Options SA Comments and Council Responses
Summary of Preferred Options SA Comments and Council Responses
(PDF)
- Size: 169.52 KB
- Estimated download time: (56k = 25 secs)
Sustainability Appraisal Note on Minor Amendments
Sustainability Appraisal Note on Minor Amendments
(PDF)
- Size: 30.07 KB
- Estimated download time: (56k = 5 secs)
Sustainability Appraisal of Regional Spatial Strategies and Local Development Documents
Core Document Library ref: PCD92
Sustainability Appraisal of Regional Spatial Strategies and Local Development Documents
(PDF)
- Size: 15.53 MB
- Estimated download time: (56k = 38 mins 47 secs)
The Conservation (Natural Habitat & c) (Amendment) Regulations 2007
The Conservation (Natural Habitat & c) (Amendment) Regulations 2007
(PDF)
- Size: 215.76 KB
- Estimated download time: (56k = 32 secs)
The Conservation Regulations 2007
The Conservation Regulations 2007
(PDF)
- Size: 215.76 KB
- Estimated download time: (56k = 32 secs)
The Council’s justification for at least 35,000 sqm net additional Retail Floorspace in the Central Shopping Area as set out in Policy CS14
Core Document Library ref: ECD07
- Size: 123.77 KB
- Estimated download time: (56k = 19 secs)
Town and Country Planning Use Class Order 1987 & Town and Country Planning (Use Classes)(Amendment)(England) Order 2005
- Size: 1.95 MB
- Estimated download time: (56k = 4 mins 53 secs)
TravelSmart in Ipswich: Final Report on the Individualised Travel Marketing Project in Ipswich (2010)
Core Document Library ref: PCD96
- Size: 1.5 MB
- Estimated download time: (56k = 3 mins 45 secs)
Verification of the SA / SEA for the Ipswich Local Development Framework, TRL
Verification of the SA / SEA for the Ipswich Local Development Framework, TRL
(PDF)
- Size: 39.5 KB
- Estimated download time: (56k = 6 secs)
Wet Dock Conservation Area Appraisal and Management Plan
Wet Dock Conservation Area Appraisal and Management Plan
(PDF)
- Size: 677.28 KB
- Estimated download time: (56k = 1 mins 41 secs)
Stay up to date: