What is the Local Validation List?
The adopted Ipswich Borough Council Local Validation List sets out all the information that Ipswich Borough Council require to be submitted prior to a planning application being validated. The Local Validation List comprises a list of documents and guidance that explains when each document is required to ensure that planning applications and other applications are supported by sufficient detailed information.
The checklist is divided into two sections, which are the national validation requirements and the local validation requirements:
The level of information required varies depending on the nature and scale of a development proposal.
If you intend to apply for planning permission or other consents, we recommend that you familiarise yourself with the Local Validation List to ensure that your application contain all the information required. If any of the required information is missing from an application it will not be validated.
Public Consultation
The Council undertook a public consultation on the draft Ipswich Borough Council Local Validation List between 19 October and 30 November 2022.
The comments the Council received are reproduced in the Consultation Statement together with the officer's response indicating how the points raised have been addressed.
Inspection of adoption documents
The Local Validation List and supporting documents are available to view below:
The documents listed above are also available for inspection at the following locations:
* To view the documents at the Council’s Offices, Grafton House, please call 01473 432019 or email planningpolicy@ipswich.gov.uk to arrange viewing.
Validation Process
On receipt of an application, the Council will firstly check the application to determine whether it’s complete.
A valid application comprises:
Once an application has been received, accompanied by all the necessary information, it will normally be validated within two working days. Notification will be given to the applicant in writing. The Council will then start the determination process.
Once an application has been received the application is given an application number. Once the application has been validated it will be placed on the planning register.
Normally, most minor and small-scale applications should be validated within three to five working days from the date of receipt. Major applications should be validated within ten working days.
Invalid applications
If an application is deemed invalid, the Council will notify the applicant of their reasons in writing.
Application Types
The table below sets out documents that could be required to validate your planning application. Not all the items listed under an application heading will apply in every case. The adopted Local Validation List includes guidance which sets out the circumstances in which you will need to submit specific information.
Biodiversity Net Gain - PLEASE TAKE NOTE
Biodiversity net gain (BNG) became mandatory for all Town and Country Planning Act development bar exemptions and non-major development from 12 February 2024. BNG will be required for development not defined as non-major development from 2 April 2024.
In November 2023, the government clarified the validation requirements for BNG eligible development proposals.
Where development would be subject to the general biodiversity gain condition, the application must be accompanied by minimum information set out in Article 7 of The Town and Country Planning (Development Management Procedure) (England) Order 2015:
If this information has not been provided, the local planning authority must refuse to validate the application. Within the planning application form applicants will be asked to confirm whether this information accompanies the application. Where these details have been provided elsewhere in accompanying documents, applicants are encouraged to refer to these rather than duplicate this information within the application form.
The above minimum information requirements should be provided in lieu of the ‘Biodiversity Gain Plan’ referred to on page 30 of the Ipswich Local Validation List, February 2023.
The Council will look to update its Local Validation List in due course.
Item | Validation Requirement |
Application Form | Required |
Ownership Certificates (A, B, C or D as applicable) & Agricultural Land Declaration | Required |
Application Fee | Required |
Location Plan | Required |
Block Plans (Existing and Proposed) | Required |
Elevation Plans (Existing and Proposed) | Required |
Floor Plans (Existing and Proposed) | Required |
Roof Plans (Existing and Proposed) | May be required |
Site Sections (Existing and Proposed) | May be required |
Street Scene (Existing and Proposed) | May be required |
Archaeological Assessment / Desk Based Assessment | May be required |
Daylight/Sunlight/ Microclimate Assessment | May be required |
Foul Drainage System Information | May be required |
Heritage Statement | May be required |
Lighting Assessment | May be required |
Noise and Vibration Assessment | May be required |
Sequential Test and Exception Test | May be required |
Site Specific Flood Risk Assessment (including Exeception Test) | May be required |
Structural Survey and Method Statement | May be required |
Tree Survey (Arboricultural Assessment) | May be required |
Item | Validation Requirement |
Application Form | Required |
Ownership Certificates (A, B, C or D as applicable) & Agricultural Land Declaration | Required |
Location Plan | Required |
Design and Access Statement | Required |
Block Plans (Existing and Proposed) | Required |
Elevation Plans (Existing and Proposed) | Required |
Floor Plans (Existing and Proposed) | Required |
Roof Plans (Existing and Proposed) | May be required |
Site Sections (Existing and Proposed) | May be required |
Street Scene (Existing and Proposed) | May be required |
Joinery Details (Existing and Proposed) | May be required |
Archaeological Assessment / Desk Based Assessment | May be required |
Heritage Statement | Required |
Lighting Assessment | May be required |
Structural Survey and Method Statement | May be required |
Item | Validation Requirement |
Application Form | Required |
Ownership Certificates (A, B, C or D as applicable) & Agricultural Land Declaration | Required |
Application Fee | Required |
Location Plan | Required |
Block Plans (Existing and Proposed) | Required |
Elevation Plans (Existing and Proposed) | May be required |
Floor Plans (Existing and Proposed) | Required |
Roof Plans (Existing and Proposed) | May be required |
Item | Validation Requirement |
Application Form | Required |
Ownership Certificates (A, B, C or D as applicable) & Agricultural Land Declaration | Required |
Application Fee | Required |
Location Plan | Required |
Block Plans (Existing and Proposed) | Required |
Elevation Plans (Existing and Proposed) | May be required |
Floor Plans (Existing and Proposed) | Required |
Roof Plans (Existing and Proposed) | May be required |
Air Quality Assessment | May be required |
Land Contamination Assessment | May be required |
Noise and Vibration Assessment | May be required |
Sequential Test and Exception Test | May be required |
Site Specific Flood Risk Assessment (including Exception Test) | May be required |
Shadow Habitats Regulation Assessment including an Appropriate Assessment | May be required |
Transport and Highways Reports | May be required |
Item | Validation Requirement |
Application Form | Required |
Application Fee | Required |
Location Plan | Required |
Block Plans (Existing and Proposed) | Required |
Elevation Plans (Existing and Proposed) | Required |
Street Scene (Existing and Proposed) | May be required |
Advertisement Details | Required |
Heritage Statement | May be required |
Lighting Assessment | May be required |
Item | Validation Requirement |
Application Form | Required |
Location Plan | Required |
Ecological Impact Assessment | May be required |
Tree Survey (Arboricultural Assessment) | May be required |